OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | Hwy 65 (4 miles South of McGregor) |
Does your property have an E911 address assigned? | Yes |
Septic Type
Select the system you are applying for: | Commercial/Cluster 1001-2500 gallons/day Commercial/Cluster Operating Permit |
Design Information
Attach Septic Design & Management Plan: |
|
Designer Name: |
None
|
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Additional Info
Additional Info (optional): | mound and holding tank on 30-0-027400 shower house on 30-0-027500 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #564 (05/19/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/19/2016 10:07 AM | $1,000.00 | x 1 | $1,000.00 |
added 05/19/2016 10:07 AM | $100.00 | x 1 | $100.00 |
Grand Total | |||
Total | $1,100.00 | ||
Payment 05/19/2016 | $1,100.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Kevin Herwig - 05/19/2016 10:12 AM - witnessed by Kalea Fischer dcd984a7ca26a54748a65cd90d8b95f9 d36bc0a724fe6a4d4c54ac50dd1c1778 | |
#1 Adminstrative Approval Group | Kalea Suihkonen - 05/19/2016 10:20 AM 02abbac15d9abd89225bc53b276df05d 62eeccb32cfa78f3615fe8c20f6e02f4 | |
#3 Final Approval | Kalea Suihkonen - 05/19/2016 10:20 AM c513df1b8be3f59b0f9ccb92339448b3 26c8c5aa9100769514be4189c5040625 | |
#2 Inspector Group | Kalea Suihkonen - 05/19/2016 10:20 AM 7e4be2c2bc242ae8f1cfc5ecffef0a36 ece715eb2f97939ef516afb1e782502f |
Text: | permit 41941 issued for commercial "other" mound and holding tank 1001-2500gpd and operating permit 494...added one page to septic design (see below) 5/20/16 attached additional form for septic design per TN |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | |
This review has been started by: | |
Zoning District of project location: | Open |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? |
Design Reviewed By: | Terry Neff |
SSTS Type: | Type III |
SSTS Design: | "Other"/Performance System (III, IV, V) |
New or Replacement SSTS: | New SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | Yes |
Does this system require an Operating Permit? | Yes |
Operating Permit #: | 494 |
Additional info (optional): |
Self Install? | |
Installer Name: |
None
|
# of New Tanks: | 4 |
# of Existing Tanks: | 0 |
Date of Final Inspection: | 07/06/2016 |
Attach Final Certificate of Installation: |
|