OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | north on hwy 65 toward Jacobson, turn east on CR 65/Loon Ave. South to 199th Place. |
Does your property have an E911 address assigned? | Yes |
Septic Type
Select the system you are applying for: | Residential Holding Tank (Type 2) |
Design Information
Attach Septic Design & Management Plan: |
|
Designer Name: |
None
|
Pumping Agreement
Attach Signed Pumping Agreement: |
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #48548 (08/12/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/21/2019 2:11 PM | $150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $150.00 | ||
Payment 08/26/2019 | $150.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Carol M. Przybilla - 08/21/2019 2:14 PM - witnessed by Shannon Wiebusch 2dda80a02a6a417c52fba5cb4e895025 10946cb3c540543bd7ad07165536297a | |
#1 Adminstrative Approval Group | Shannon Westerlund - 08/26/2019 1:28 PM 6ad78d1650d25ef1ae2622abce0bf328 1fdcab1cfb1f5da88ee959bd4238f922 | |
#3 Final Approval | Jan Yearneau - 08/26/2019 3:16 PM 4522cab3a50e298b4d61fe45a2ed710b 677d682a724a6bcfe158ba3ea8a746cb | |
#2 Inspector Group | Becky Sovde - 08/26/2019 1:41 PM 1d78a27690eb4ab156c4f956c4d4fcd2 878d0b7d724eb4355fce999dc4f944e4 |
Text: | Permit# 44596. Approved for 2 bedroom Type II 2,950 gallon holding tank replacement |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 08/26/2019 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | 75 ft. |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | Yes |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? |
Design Reviewed By: | Becky Sovde |
SSTS Type: | Type II |
SSTS Design: | Holding Tank(s) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 2 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |
Self Install? | |
Installer Name: |
None
|
# of New Tanks: | 2 |
# of Existing Tanks: | 0 |
Date of Final Inspection: | 09/25/2019 |
Attach Final Certificate of Installation: |
|