OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location
Property: |
|
Does your property have an E911 address assigned? | Yes |
Project Details
Have you had a pre-application meeting with Planning and Zoning to review your concept plan? | Yes |
Please attach all supporting documents.: |
|
Please select all that apply.: | Administrative Subdivision |
Number of Lots - Administrative Subdivision
# of Lots if applying for an Administrative Subdivision: | 2 |
Other Information
Other information: | I am the Personal Representative of the Estate for Estelle Juckel. Attached is the court order from Istanti County Court |
Other Attachments: |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #1062 (07/06/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/06/2016 8:12 AM | $75.00 | x 2 | $150.00 |
Grand Total | |||
Total | $150.00 | ||
Payment 07/06/2016 | $150.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Thomas E. Juckel - 07/06/2016 8:57 AM 3ca0e964f01094934f8b006f130f1416 8beaea5d2fc29d098393c63654f4ae32 |
Text: | 8/11/2016 a partial refund of $100 was given via ACH. KK 8/10/2016 PERMIT REQUEST DENIED. LOT DOES NOT HAVE THE REQUIRED SEPTIC SITES. 7/8/216 called Thomas, told him to contact ists designer on the site discrepancies and fix them otherwise we could do a lot line adjustment. and combine the 5 in with the 40. 7/8/16 talked to Mike O'keefe and the sites on the survey are not the septic sites. Contacting applicant as it cant be approved without the sites. I have call in with septic designer for site verification. PG |
File(s): |
|
Is the property Registered (Torrens)? |
Text: | 8.9.16 emailed Pete - should this be denied or sent to the next approval level? KK Currently has building without permit violations see complaint file. PG 7/20/16 No ISTS sites per septic designer Mike O'keefe. |
File(s): |
Date application was complete: | |
This review has been started by: | Pete Gansen |
Zoning District: | Farm Residential |
Is this an After-The-Fact application? | No |