Land Alteration Permit # 2016-0315, App. # App-2016-000341, UID # 949
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
David Nelson
Phone:
(218426 - 3112
Email Address:
dray3275@yahoo.com
Mailing Address:
19233 484th Street
McGregor Mn 55760
Are you the Property Owner? Yes

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-14690019233 484th St
MCGREGOR, MN 55760
SHAMROCK TWPSHESHEBE POINTS:21 T:49 R:23GDMINNEWAWA LAKEWHITE, DAVID A & CHERYL LWHITE, DAVID A & CHERYL L
Driving directions to the property from Aitkin.:
169 & 210 east from Aitkin, 210 east to McGregor, 65 north 5 miles to cty #6, east 4 miles to T-188th, north 2 miles to 'Y', stay left 1st driveway on left

Project Description

Please describe your proposed project:
Rip rap approximately 65' of shoreline to underneath the dock, remaining 35' is in good vegetative state, take out one tree that is falling into lake and replace it with another in an appropiate spot, a small beach area about 10x10 will be include in the rip rap

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of alteration.
Distance of alteration to property lines.
Distance of alteration to existing structures.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 1
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Mechanical Clearing
Hand Clearing
Please explain:
chainsaw and a bobcat to remove the tree

Excavation Details

Nature of Material to be used?
(Check all that apply)
Rock
Total Amount of Excavation and/or Fill proposed? (cubic yards) 25 CuYd
Total Area to be Graded and/or Filled? (L x W) 260 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Tree Planting
Other (explain below)
If other, please explain:
replacing vegetation that was disturbed
Describe how you intend to implement this plan
and your finished vegetation plan.:
native flowers and vegetation that are lost will be replaced on top of shoreline and in the rip rap up to 4 to 6' back

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #651 (05/24/2016)

Charge Cost Quantity Total
Non-Taxable
added 05/25/2016 6:21 AM

$150 Flat Fee

$150.00 x 1 $150.00
Grand Total
Total $150.00
Payment 05/25/2016$150.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantDavid R. Nelson - 05/25/2016 6:21 AM
7e46c9273143f7ff20604509e8c88408
cdaf869ad756cd1fb19b480c4668ad3e
 
#1 Adminstrative Approval GroupKalea Suihkonen - 05/26/2016 3:39 PM
4b6efb982bd8675c41d395d17f8eb222
598ee9a051cc2c5e53153c41d17936bc
 
#2 Inspector GroupBryan Hargrave - 06/06/2016 8:20 AM
b90842d03758615efae1554a20928e57
f929e06c9e2d97db84bca991538c5723
 
#3 Final ActionKalea Suihkonen - 06/06/2016 3:36 PM
19431d96f778eef8b745e2462c8e1542
230bb1be7b7ad7f8f597d58603e26a4e
 
Application has been approved. All signatures have been obtained.
Text:
permit 42009 issued for land alteration (rip rap) per approved plan
File(s):
Text:
File(s):
    Date application was complete:
    This review has been started by:
    Zoning District of project location: Shoreland
    Zoning Inspector: Bryan Hargrave
    Attach necessary inspection forms:
    Is the project in the Shore Impact Zone?
    Was an onsite conducted for this application?
    Is this an After-The-Fact application? No
    Project located in the floodplain?
    Base Flood Elevation:
    Powered by