OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 169 & 210 east from Aitkin, 210 east to McGregor, 65 north 5 miles to cty #6, east 4 miles to T-188th, north 2 miles to 'Y', stay left 1st driveway on left |
Project Description
Please describe your proposed project: | Rip rap approximately 65' of shoreline to underneath the dock, remaining 35' is in good vegetative state, take out one tree that is falling into lake and replace it with another in an appropiate spot, a small beach area about 10x10 will be include in the rip rap |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of alteration. Distance of alteration to property lines. Distance of alteration to existing structures. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 1 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing Hand Clearing |
Please explain: | chainsaw and a bobcat to remove the tree |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Rock |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 25 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 260 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Tree Planting Other (explain below) |
If other, please explain: | replacing vegetation that was disturbed |
Describe how you intend to implement this plan and your finished vegetation plan.: |
native flowers and vegetation that are lost will be replaced on top of shoreline and in the rip rap up to 4 to 6' back |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #651 (05/24/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/25/2016 6:21 AM $150 Flat Fee |
$150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $150.00 | ||
Payment 05/25/2016 | $150.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | David R. Nelson - 05/25/2016 6:21 AM 7e46c9273143f7ff20604509e8c88408 cdaf869ad756cd1fb19b480c4668ad3e |
#1 Adminstrative Approval Group | Kalea Suihkonen - 05/26/2016 3:39 PM 4b6efb982bd8675c41d395d17f8eb222 598ee9a051cc2c5e53153c41d17936bc |
#2 Inspector Group | Bryan Hargrave - 06/06/2016 8:20 AM b90842d03758615efae1554a20928e57 f929e06c9e2d97db84bca991538c5723 |
#3 Final Action | Kalea Suihkonen - 06/06/2016 3:36 PM 19431d96f778eef8b745e2462c8e1542 230bb1be7b7ad7f8f597d58603e26a4e |
Public Notes
Text: | permit 42009 issued for land alteration (rip rap) per approved plan |
File(s): |
|
Internal Notes
Text: | |
File(s): |