Land Use Application Permit # 2016-0492, App. # App-2016-000101, UID # 591
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Brett Paige
Phone:
(320630 - 6270
Email Address:
bjpaige65@yahoo.com
Mailing Address:
62180 State Hwy 23
Askov MN 55704
Are you the Property Owner? No

Property Owner Contact

Property Owner Email: sfales65@msn.com
Property Owner Phone:
(515991 - 6393

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
34-1-08470013122 102nd Pl
FINLAYSON, MN 55735
WAGNER TWPPINE LAKE ESTATESS:13 T:43 R:22RDBIG PINE LAKE (Wagner)FALES, STACEY W TRUSTEEFALES, STACEY W TRUSTEE
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
Hwy 47 South to Hwy 18 - East to Sprandel Rd, turn right. Go North to North Pine Lake Rd to Lot 9.

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Design Information

Attach Compliance Inspection.:

Project Description

Please describe your proposed project:
32x74 residence

Project Type

Item 1 - Structure Type: New Residence incl. attached decks/porches/garages
Item 1 - Size: 2368 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 110 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? Yes
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 298 CuYd
How close to the property line will any fill be placed or any excavation be done? 12 Feet
What percent slope of the land currently exists on the project site? 27 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Black dirt and seed with straw

Site Plan

Additional Info

Additional info:
(optional)
6/28/16 cu yds, slope and erosion control changed, omitted 6x22, working with Steve Hughes
Initial application was denied, information has been updated and can now be approved
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #300 (04/25/2016)

Charge Cost Quantity Total
Non-Taxable
added 04/25/2016 8:19 AM

$350 Flat Fee

$350.00 x 1 $350.00
Grand Total
Total $350.00
Payment 04/25/2016$350.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantStacey Fales - 07/06/2016 2:04 PM - witnessed by Kalea Fischer
5349a485512a49cf1be3ba1d23f06d0c
d8d5da7247d5918b3ab3154061bdee50
 
#1 Adminstrative Approval GroupKristi Kunz - 04/25/2016 9:16 AM
e8edb6c1744f1ee79348254bf28713c7
87aa2b512ef59a8141ce39940dbb12c4
 
#2 Inspector GroupKevin Turnock - 07/07/2016 8:13 AM
a8e9e9243499949d5ef5de653bec2868
fe6a57eb194260f65068e4aca5bb3b05
 
#3 Level Three Final ActionKalea Suihkonen - 07/11/2016 9:15 AM
0ea369e63b16904a8598f2e53dbbc639
0c116dda5deea8943c8eea317d1c31f8
 
Application has been approved. All signatures have been obtained.
Text:
permit 42128 issued for a 32x74 ft residence per approved plan
Must remove living quarters/plumbing from garage/residence (p36331)
File(s):
Text:
7/6/16 rec'd ltr and site photos from Steve Hughes @ SWCD (added to application) KS
6/28/16 application moved to incomplete - information updated
File(s):
    Date application was complete:
    Review started by:
    Zoning District of project location: Shoreland
    Required OWHL setback distance: 100 ft.
    "Other" OHWL setback distance is:
    Project located in the floodplain? No
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? N/A
    Septic Tank setback appears to be met with/without an engineer's report? Yes
    Septic Drainfield setback appears to be met with/without an engineer's report? Yes
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Kevin Turnock
      Attach necessary inspection forms/photos:
        Notes:
        Needs erosion control plan approved by SWCD. Sent builder an e-mail on 5-6-16 informing him of this.
        Living quarters must be removed from existing garage/residence prior to permit expiration.
        Was an onsite conducted for this application?
        Self Install?
        Installer Name:
        None
        New Tanks:
        Existing Tanks:
        Date of Final Inspection:
        Attach Final Certificate of Installation:
          Low Interest Loan or SSTS Grant project?
          Powered by