OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | darlowexc@hotmail.com |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | 51272 Lake Ave MCGREGOR, MN 55760 |
Septic Type
Select the system you are applying for: | Commercial/Cluster 501-1000 gallons/day Commercial/Cluster Operating Permit |
Design Information
Attach Septic Design & Management Plan: |
|
Designer Name: |
|
Operating Permit
Attach the Operating Permit Application & Maintenance Contract: |
|
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
|
Terms
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Property lines, septic sites, wells, and road right-of-ways must be clearly defined with flags, ribbon, or lathe prior to onsite inspection by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #57887 (06/23/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/23/2023 11:55 AM | $600.00 | x 1 | $600.00 |
added 06/23/2023 11:55 AM | $150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $750.00 | ||
Payment 06/23/2023 | $750.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Ernie Darlow - 07/13/2023 4:28 PM - witnessed by Shannon Wiebusch 6897eb0212d9c0454a26f3ea3b9cd179 9039279fbd6aa3ce153f104d5d2078ae | |
#1 Adminstrative Approval Group | Shannon Wiebusch - 07/13/2023 4:29 PM 9c0aa6917c9a06b2cdc8efa70a7a039c 5121177e0ac1fea94db1a1fd80aff5b0 | |
#3 Final Approval | Connor Plagge - 07/19/2023 4:03 PM 387259dbbcd33fc66ead5ec3bb523948 f103226600ff4a80a2ffbd9276c12991 | |
#2 Inspector Group | Shannon Wiebusch - 07/18/2023 11:40 AM 464da5170e88f642caad7f4fa367dca9 27e134d699875b24a43bc92b9f9ef1a1 |
Text: | Permit #47993 Approved for a 750 GPD Type V commercial septic with operating permit #839 Design approved by Tom Esperson L1719. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 06/23/2023 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Design Reviewed By: | Please select |
SSTS Type: | Type V |
SSTS Design: | "Other"/Performance System (III, IV, V) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | Yes |
Does this system require an Operating Permit? | Yes |
Operating Permit #: | 839 |
Additional info (optional): |
|
Self Install? | No |
Installer Name: |
|
# of New Tanks: | 3 |
# of Existing Tanks: | 0 |
Date of Final Inspection: | 07/27/2023 |
Attach Final Certificate of Installation: |
|