OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | 3 miles east of Hill City on Highway 200 |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Indemnification Form
Complete and attach Indemnification Form for a Self Install: |
Project Description
Please describe your proposed project: | 30 wide by 32 long attached garage on east side of house 9 ft 2 inch inside ceiling height |
Project Type
Item 1 - Structure Type: | Residence Addition |
Item 1 - Size: | 960 ft2 |
Site Plan
Please include all applicable items from the checklist on your site plan. See example site plan below: | All Existing Structures & Dimensions All Proposed Structures & Dimensions Location of Driveways & Access Roads Location of Well(s) Location of Septic System(s) Distance of Proposed Structures to OHWL (closest point) Distance of Proposed Structures to Septic System(s) Distance of Proposed Structures to Property Lines Distance of Proposed Structures to Road Right-of-Way Distance of Proposed Structures to Alley or Boulevard Distance of Proposed Structure to Top of Bluff |
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #57139 (04/14/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/14/2023 5:33 PM $400 Flat Fee |
$400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 04/14/2023 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Jeffery J. Hallermann - 04/14/2023 5:34 PM 4ab54b5e7a6243ea3efec5a669a52277 d9682cb6892ffe531cf7fdd9b6c74cfb | |
#1 Adminstrative Approval Group | Brock Anderson - 04/17/2023 10:28 AM 95d5b45d6cdc34b329415065d9d9e048 6d09cb460e9679294478eec598720916 | |
#2 Inspector Group | Brock Anderson - 04/19/2023 7:54 AM d866a7ae450dd02b593f9b00761c5e1f d76f2e2462a17fac82c33c1b02b977d2 | |
#3 Level Three Final Action | Kim Burton - 04/20/2023 2:38 PM 6ed30d1eb0ed58a5704e675daf3b6378 61b77411f9a3c16f80e875a0c17cd2c9 |
Text: | Permit # 47631. Approved for 960 sq/ft Residence Addition |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 04/17/2023 |
Review started by: | Brock Anderson |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | No |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | Redevelopment |
Is this After-The-Fact? | No |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Brock Anderson |
Attach necessary inspection forms/photos: |
|
Notes: | |
Was an onsite conducted for this application? | Yes |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |