OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone: |
|
||||
Property Owner Email: | jecaa@comcast.net |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | Go South from Aitkin on Hwy 169 to Co. Rd 28 then go west on 28 to 432nd turn on 432nd to 28237, second to last place on end of 432nd |
Septic Type
Select the system you are applying for: | Residential Other/Performance (Type 3) Residential Operating Permit (Type 3, 4, 5) |
Design Information
Attach Septic Design & Management Plan: | |
Designer Name: |
None
|
Operating Permit
Attach the Operating Permit Application & Maintenance Contract: |
Pumping Agreement
Attach Signed Pumping Agreement: |
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License Number: | L2941 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #55645 (07/18/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/18/2022 8:07 AM | $150.00 | x 1 | $150.00 |
added 07/18/2022 8:07 AM | $400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $550.00 | ||
Payment 07/18/2022 | $550.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | John K. Benson - 07/18/2022 8:08 AM e7a7a924566f633f803d6e07054677ea d8a88204706cd112bc3bf9401f6dbae1 | |
#1 Adminstrative Approval Group | Molly Oestreich - 07/20/2022 12:35 PM 2cde4ce65c1b50d82980fe533e46767f 1dc980648258d15632dc8d03c02991ec | |
#3 Final Approval | Sarah McMillan - 08/09/2022 3:10 PM c7c432ccdfeb9be26bdd32dbf2f9edcb 26b30ad6213dbe2aff3b7a70eb2be2c3 | |
#2 Inspector Group | Shannon Wiebusch - 08/09/2022 2:29 PM 8ca4685524e84b1c1cc308a2162a73b1 3ada1c2a9e0d0d04e9d3b230384abf23 |
Text: | Permit #47208 Approved for a 5 bdrm Type III mound septic with operating permit #792 |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 07/18/2022 |
This review has been started by: | Molly Oestreich |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Design Reviewed By: | Kevin Turnock |
SSTS Type: | Type III |
SSTS Design: | "Other"/Performance System (III, IV, V) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 5 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | Yes |
Operating Permit #: | 792 |
Additional info (optional): |
Self Install? | |
Installer Name: |
None
|
# of New Tanks: | 2 |
# of Existing Tanks: | 0 |
Date of Final Inspection: | 10/03/2022 |
Attach Final Certificate of Installation: |
|