Septic Only Permit # 46961, App. # App-2022-008938, UID # 205439
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Applicant contact information:
Name:
Joseph Sirba
Phone:
(952356 - 9725
Email Address:
frjsirba100@outlook.com
Mailing Address:
P.O. Box 490
Hinckley MN 55037
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
09-1-09210032639 Nuthatch Ave
AITKIN, MN 56431
GLEN TOWNSHIPANDERSON BEACHS:10 T:46 R:25RDLONG LAKE (GLEN TWP)SIRBA, JOSEPHSIRBA, JOSEPH
Enter directions to the property (if no address assigned):
Go to Nuthatch Avenue on Long Lake

Septic Type

Select the system you are applying for:
Residential Holding Tank (Type 2)

Design Information

Attach Septic Design & Management Plan:
Designer Name:
None

Operating Permit

Attach the Operating Permit Application & Maintenance Contract:

Pumping Agreement

Installer

Self Install or Licensed Install?: Licensed Septic Installer
Licensed Installer Name:
None
Installer License Number: L 4071

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Septic Permit General Terms & Conditions
  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #55230 (05/31/2022)

Charge Cost Quantity Total
Non-Taxable
added 05/31/2022 1:46 PM

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 06/03/2022$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJoseph Sirba - 05/31/2022 1:52 PM
cf1bc960fbf2d48481d7a50b7226d730
0f424bbba732678eaae6906f6bea752f
 
#1 Adminstrative Approval GroupMolly Oestreich - 06/08/2022 4:10 PM
0be130f0c82121ba7293c392c896e90b
bfd8a2454de167183dba844e40092322
 
#3 Final ApprovalSarah McMillan - 06/09/2022 8:21 AM
0c6498f2d1f6af49a42723a99ed00139
6e68846ed6ea032f2672e5d518743df9
 
#2 Inspector GroupMolly Oestreich - 06/08/2022 4:10 PM
63bc94b7b8bc236d8f9e4ad06cf87ce1
e55db8f5a5c5241b6761510e8e1e91da
 
Application has been approved. All signatures have been obtained.
Text:
Permit #46961 Approved for a Type II holding tanks.

Applicant requested extension on 6/5/23. Permit extended 90 days until 9/9/23.  sw
File(s):
Text:
File(s):
    Date application was complete: 05/31/2022
    This review has been started by: Kim Burton
    Zoning District of project location: Shoreland
    Required OHWL setback distance:
    "Other" OHWL setback distance is:
    Pumping Agreement Attached?
    Low Interest Loan or SSTS Grant project?
    Is this an After-The-Fact application?
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified?
    Design Reviewed By: Kevin Turnock
    SSTS Type: Type II
    SSTS Design: Holding Tank(s)
    New or Replacement SSTS: Replacement SSTS
    GPD: 1-2,499 gpd
    # of bedrooms: 2
    Is this a Cluster System? No
    Does this system belong to an Other Establishment? No
    Does this system require an Operating Permit? No
    Operating Permit #:
    Additional info (optional):
      Self Install? No
      Installer Name:
      NameLicense #ExpirationPhoneAddressInspectorInstallerMaintainerService Provider
      Fairchild Construction LLCL407108/02/202440313 344th St, Aitkin MN 56431NoYesNoNo
      # of New Tanks: 3
      # of Existing Tanks: 0
      Date of Final Inspection: 08/16/2023
      Attach Final Certificate of Installation:
      Powered by