OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | Go to Nuthatch Avenue on Long Lake |
Septic Type
Select the system you are applying for: | Residential Holding Tank (Type 2) |
Design Information
Attach Septic Design & Management Plan: | |
Designer Name: |
None
|
Operating Permit
Attach the Operating Permit Application & Maintenance Contract: |
Pumping Agreement
Attach Signed Pumping Agreement: |
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License Number: | L 4071 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #55230 (05/31/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/31/2022 1:46 PM | $200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 06/03/2022 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Joseph Sirba - 05/31/2022 1:52 PM cf1bc960fbf2d48481d7a50b7226d730 0f424bbba732678eaae6906f6bea752f |
#1 Adminstrative Approval Group | Molly Oestreich - 06/08/2022 4:10 PM 0be130f0c82121ba7293c392c896e90b bfd8a2454de167183dba844e40092322 |
#3 Final Approval | Sarah McMillan - 06/09/2022 8:21 AM 0c6498f2d1f6af49a42723a99ed00139 6e68846ed6ea032f2672e5d518743df9 |
#2 Inspector Group | Molly Oestreich - 06/08/2022 4:10 PM 63bc94b7b8bc236d8f9e4ad06cf87ce1 e55db8f5a5c5241b6761510e8e1e91da |
Public Notes
Text: | Permit #46961 Approved for a Type II holding tanks. Applicant requested extension on 6/5/23. Permit extended 90 days until 9/9/23. sw |
File(s): |
|
Admin Checklist
Date application was complete: | 05/31/2022 |
This review has been started by: | Kim Burton |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? |
DESIGN REVIEW CHECKLIST
Design Reviewed By: | Kevin Turnock |
SSTS Type: | Type II |
SSTS Design: | Holding Tank(s) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 2 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |