OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | From Aitkin South on Hwy169 --take right on 303rd Lane. Enter Shingwauk Village, second cabin on the right north side |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | No |
Project Description
Please describe your proposed project: | The current Cabin is 36' long and 30" wide. It has a 3 season porch attached 12' x12' We are proposing to lift the cabin and add on an addition to the east 20' x 30'. Three season porch will be removed and a poured wall foundation will be under that used for storage and the second floor will be a sun room open to the living room. The Foundation will be a poured ICF walls with full basement and walk out. The lower level of the new addition to the East will be Garage. The upper level will have 2 new bedrooms. Existing deck to be removed and new one installed much smaller than original one, 21' x 20' See plan On the North and side of the cabin is a large hill and the water runoff needs to be controlled. Currently the cabin sits at ground level on the North side and part of the West. Over the last 50 years some water has possibly created some issues with the Joists. May need to be repaired. Wont know until we lift it. In order to eliminate this issue in the future we need to raise the cabin 2 feet to get the base of the cabin off the ground. The current height of the structure from ground to the peak is about 16-17 feet. We will not increase the height of the current structure just get get it off the ground so the cabin sits on the concrete foundation and not on the ground. The current foundation is a boulder pyramid type foundation and is original. There is a crawl space under the cabin. About 4' hi on the south side and about 6" on the north side. This has to be changed and a retaining wall will be installed about 6" from the poured wall foundation. See page 2 of the design and comments in Natural Landscape protetion Plan |
What is the height of your structure? | 17 Feet |
Project Type
Item 1 - Structure Type: | New Residence incl. attached decks/porches/garages |
Item 1 - Size: | 1917 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 100 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | No |
Are you constructing a walkout basement? | Yes |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | Yes |
How many cubic yards of fill or excavation will be done on the property? | 100 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 0 Feet |
What percent slope of the land currently exists on the project site? | 17 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
As mentioned in other section I have a hill on the North side of the Cabin that creates water run off. Needs to be controlled. We will be installing a 6-8' retaining wall about 6 feet from the cabin on the north and west side. ( SEE PAGE 2 OF DESIGN) About 5 ' of the wall will be buried with the rest exposed . There will be drain tile installed on the North side of the retaining wall and possibly South side.. The wall will be concrete using the Pan concept. The earth between the cabin and the new wall will be removed , wall installed and removed earth put back in place between cabin and wall with natural planting in between. With raising the cabin 2' this will eliminate future water issues with the foundation. Raising the cabin is a necessity. Other erosion control will be new sod planted in the front and more natural planting to absorb more water coming off the hill. A and flatten out land in front of cabin so not as steep |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
House will be lifted and lowered down to new foundation. If we lift cabin 10' for the excavation we will lower it back down 8 ' to gain the 2' we need to protect foundation and water run off from the hill. I have problems with my computer at home interfacing with the counties computer to best way to contact me is cell phone 612-804-4302 thru voice call or a text. We are hoping to start project right after labor day as i have all contractors lined up. We need to lift it and set it back down by October 20 |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53159 (07/26/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/26/2021 11:21 AM $400 Flat Fee |
$400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 07/26/2021 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Thomas Browne - 07/26/2021 11:50 AM 732bbfba8682616deb820d2b8665034b 6daa739e63d6222053ce8b5a2531cf0d | |
#1 Adminstrative Approval Group | Shannon Wiebusch - 07/26/2021 12:03 PM 2a85b0c62b387130fb8b45a47fe666d9 4e1644664689dea351359780e2442afa | |
#2 Inspector Group | Bryan Hargrave - 08/12/2021 7:32 PM 09fd47dd537acb47fb2ca37c48a3cad7 d013f985750e7f15fd554be4b2646c6f | |
#3 Level Three Final Action | Molly Burman - 08/13/2021 9:00 AM 7a13c9b001fcb6ccc87dd61c4b8242bc f1d0d7959a173ac35e08ed0ef600cb7b |
Text: | Permit #46315. Approved for a 1917 sf new residence including a retaining wall and deck. Running permit as a new residence due the increase in height of the existing cabin plus the additions and new full basement. sw |
File(s): |
|
Text: | increased foot print and height increase will run as a new residence. sw returned to applicant to add plans for retaining wall. applicant will stop in to add information on increasing height of structure by 2 feet. sw |
File(s): |
Date application was complete: | 07/26/2021 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 100 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: |
|
Notes: | Meets all setback requirements. Approved for a 1917 sf new residence including a retaining wall and deck. |
Was an onsite conducted for this application? | Yes |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |