Land Use Application Permit # 2020-6146, App. # App-2020-006748, UID # 201562
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Brian Hammon
Phone:
(715817 - 4080
Email Address:
brian.hammond@enbridge.com
Mailing Address:
13 E. Superior St.
Ste. 125
Duluth MN 55802
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
20-0-049800MACVILLE TWPS:30 T:51 R:26ENBRIDGE ENERGY LPENBRIDGE ENERGY LP
20-0-049901MACVILLE TWPS:30 T:51 R:26ENBRIDGE ENERGYENBRIDGE ENERGY
20-0-050000MACVILLE TWPS:31 T:51 R:26ENBRIDGE ENERGY LPENBRIDGE ENERGY LP
20-0-05010058987 Osprey Ave
SWATARA MN 55785
MACVILLE TWPS:31 T:51 R:26ENBRIDGE ENERGY LPENBRIDGE ENERGY LP
20-0-050200MACVILLE TWPS:31 T:51 R:26ENBRIDGE ENERGY LPENBRIDGE ENERGY LP
20-0-050400MACVILLE TWPS:31 T:51 R:26ENBRIDGE ENERGY LPENBRIDGE ENERGY LP
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
From the MacVille Town Hall Proceed:
0.25 miles west to the intersection of Atkin County 19 and 29.  
Turn Left.
Proceed South on Aitkin County 29 (osprey Ave) for 1.7 Miles.
Driveway is on the right.
58991  Osprey Avenue.  
Google directions are incorrect and will send you North of Swatara on Osprey Ave.

Project Checklist

1.) Is the property zoned Shoreland? No
3.) Are there any wetlands or lowlands on/near the project site? Yes
4.) Will the structure(s) be used for commercial purposes? Yes
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
Enbridge proposes to build a pump station, and electrical building in conjunction with it's Line 3 replacement project.  This permit covers the pump building and electrical service building.  A separate permit will be submitted to cover the restroom building and septic system (or holding tank) when the subcontractor for that scope has been selected.

The pump building measures 70' x 124'
The Electrical Service Building measures 27'-6" x 71'-6"
What is the height of your structure? 33 Feet

Project Type

Item 1 - Structure Type: New Commercial Building
Item 1 - Size: 8680 ft2
Item 2- Structure Type (if applicable): New Commercial Building
Item 2 - Size: 1980 ft2

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

General Terms Zoning Permits
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #51461 (11/09/2020)

Charge Cost Quantity Total
Non-Taxable
added 11/06/2020 3:29 PM

$600 Flat Fee

$600.00 x 1 $600.00
added 11/06/2020 3:29 PM

$400 Flat Fee

$400.00 x 1 $400.00
Grand Total
Total $1,000.00
Payment 11/09/2020$1,000.00
Due$0.00

Approvals

ApprovalSignature
ApplicantBrian Hammond - 11/09/2020 8:54 AM
5b696ebbeab32e3713f7d1b7d9f414a4
21e76a08dec69185e2a2a038402fed15
#1 Adminstrative Approval GroupShannon Westerlund - 11/09/2020 11:28 AM
8491b634e9a0c9c6413f8f8462b085e0
77f699fbff6ce41f4ef7bd223d88513d
#2 Inspector GroupBecky Sovde - 11/24/2020 2:09 PM
7d00a573dbbf50a78311e9335776c020
32f14160c791f4d3e9d721718b813436
#3 Level Three Final ActionKarin Martinjako - 11/24/2020 2:42 PM
31ca565fde4e0b4867a162daaf34a3a9
57abfe17584e9f335e50d6c6ff7bde64
Application has been approved. All signatures have been obtained.

Public Notes

Text:
PERMIT 45699. Approved for 70 x 124 commercial structure and 28 x 72 commercial structure.
File(s):

Admin Checklist

Date application was complete: 11/09/2020
Review started by: Shannon Wiebusch
Zoning District of project location: Open
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? N/A
Septic Drainfield setback appears to be met with/without an engineer's report? N/A
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Becky Sovde
Attach necessary inspection forms/photos:
    Notes:
    Federal approvals were given for the wetland impacts.  Engineering and survey show the structures will meet all setbacks.  RS  11-24-2020
    Was an onsite conducted for this application? No
    Powered by