Septic Only Permit # 2019-4233, App. # App-2019-004702, UID # 198106
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Applicant contact information:
Name:
Larry Liljenquist
Phone:
(218820 - 8886
Email Address:
liljenquistsewer@yahoo.com
Mailing Address:
30477 State Hwy 47
Aitkin MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone:
(507398 - 6871
Property Owner Email: maxson213@hotmail.com

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
56-0-16060035878 422nd Pl
AITKIN, MN 56431
AITKIN CITYS:27 T:47 R:27MAXSON, KENT & PAMMAXSON, KENT & PAM
Enter directions to the property (if no address assigned):
Approximately 1 mile west of Aitkin on HWY 210.  Location is on right side of Highway in-between Cedarbrook Lumber and Unclaimed Freight.

Septic Type

Select the system you are applying for:
Commercial/Cluster 1-500 gallons/day

Design Information

Attach Septic Design & Management Plan:
Designer Name:
None

Installer

Self Install or Licensed Install?: Licensed Septic Installer
Licensed Installer Name:
None
Installer License Number: 127

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Septic Permit General Terms & Conditions
  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

Invoice #48061 (06/24/2019)

Charge Cost Quantity Total
Non-Taxable
added 06/24/2019 7:08 AM

$500.00 x 1 $500.00
Grand Total
Total $500.00
Payment 06/24/2019$500.00
Due$0.00
Action: Print  

Invoice #48768 (09/09/2019)

Charge Cost Quantity Total
Non-Taxable
added 09/09/2019 2:11 PM

$100.00 x 1 $100.00
Grand Total
Total $100.00
Payment 09/09/2019$100.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantLarry Liljenquist - 06/24/2019 7:09 AM
519ae1f81816c861198fb4ced9dbe045
88f3576feaa6bda99deeba0c4f057eac
 
#1 Adminstrative Approval GroupKim Burton - 06/25/2019 9:22 AM
05f3b44322fb331a9f21fe743b6718aa
9036c551ab35fa32bd0b85d20b4338f6
 
#3 Final ApprovalKim Burton - 06/26/2019 11:07 AM
b0b988c415a04b7d67c13684b42a977b
15d8a98be01771a1f4d4e672911b493b
 
#2 Inspector GroupKim Burton - 06/25/2019 4:06 PM
5ebefa42ae3cccefac00ba2c03c0f035
15a58b854fbaf96cec30e7f1bdf83a15
 
Application has been approved. All signatures have been obtained.
Text:
9/24/19 amended to Type III Mound at install. Operating permit# 681 attached.
Permit # 44375. Approved for a Two bedroom type I mound septic.(Holding tanks for meat processing area.)
File(s):
Text:
Emailed to KT. 6/25/19 Kb
File(s):
    Date application was complete: 06/24/2019
    This review has been started by: Kim Burton
    Zoning District of project location: City Limits
    Required OHWL setback distance:
    "Other" OHWL setback distance is:
    Pumping Agreement Attached?
    Low Interest Loan or SSTS Grant project? No
    Is this an After-The-Fact application? No
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified?
    Design Reviewed By: Kevin Turnock
    SSTS Type: Type III
    SSTS Design: "Other"/Performance System (III, IV, V)
    New or Replacement SSTS: Replacement SSTS
    GPD: 1-2,499 gpd
    # of bedrooms: 2
    Is this a Cluster System? No
    Does this system belong to an Other Establishment? No
    Does this system require an Operating Permit? No
    Operating Permit #: 681
    Additional info (optional):
      Self Install?
      Installer Name:
      None
      # of New Tanks: 3
      # of Existing Tanks: 0
      Date of Final Inspection: 09/23/2019
      Attach Final Certificate of Installation:
      Powered by