OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Owner Contact
Property Owner Email: | |||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | From Lawler: North on Cty Rd 16. Left (west) on 370th Street Right )(north) on 160th. About 2 miles up, 160th turns to the west, then back again to north... driveway is off the corner where 160 turns back to the north. From Hwy 65: Turn east off of Hwy 65 onto Cty Rd 30. Just past Sheriff Lake, turn right (south) on 160th. When 160th turns east, driveway goes to right off of that corner. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
2.) Is the property located in a flood zone? | |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? |
Septic Type
Select the type of septic you are applying for: |
Design Information
Attach Septic Design & Management Plan: | |
Septic Designer: |
None
|
Pumping Agreement
Attach Pumping Agreement: |
Installer
Self Install or Licensed Install: | |
Licensed Installer Name: |
None
|
Indemnification Form
Complete and attach Indemnification Form for a Self Install: |
Project Description
Please describe your proposed project: | I am building a 26 x 36 cabin with a 6 x 25 attached front porch (with roof) |
Project Type
Item 1 - Structure Type: | New Residence incl. attached decks/porches/garages |
Item 1 - Type of Construction: | |
Item 1 - Size: | 1086 ft2 |
Item 2- Structure Type (if applicable): | |
Item 2 - Type of Construction: | |
Item 2 - Size: | ft2 |
Item 3 - Structure Type (if applicable): | |
Item 3 - Type of Construction: | |
Item 3 - Size: | ft2 |
Item 4 - Structure Type (if applicable): | |
Item 4 - Type of Construction: | |
Item 4 - Size: | ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | |
Are you constructing a walkout basement? | |
If you are building an accessory structure, will there will be a loft or second story? | |
If you are building an accessory structure,
please provide sidewall height and if there will be a loft or second story.: |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | |
(If yes, please attach plan): | |
How many cubic yards of fill or excavation will be done on the property? | CuYd |
How close to the property line will any fill be placed or any excavation be done? | Feet |
What percent slope of the land currently exists on the project site? | % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
Other: |
Site Plan
Please include all applicable items from the checklist on your site plan. See example site plan below: | |
Attach Site Plan: |
|
Is the site staked and ready for inspection? |
Additional Info
Additional info: (optional) |
Footings and walls to be poured in 2016. Slab and construction to begin in summer 2017. |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #1385 (08/08/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/08/2016 11:32 AM $300 Flat Fee |
$300.00 | x 1 | $300.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 08/08/2016 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Thomas K. Heiland - 08/08/2016 11:32 AM 8016473aa5e87e54c71288fa4ebcc911 fb85d3ece3d66fdd1c03580285d90e14 |
#1 Administrative Review | |
#2 Inspector Review | |
#3 Final Approval |
Public Notes
Text: | The application is being Denied as it is still in incomplete status as of 9/9/2016. A full refund of $300 will be issued via ACH today. If you would like to reapply, please do so by starting a new application. Kristi K. moving to incomplete-need septic plans. emailed applicant 8/9/16. KS |
File(s): |
Admin Checklist
Date application was complete: | |
Review started by: | |
Zoning District of project location: | |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | |
Road R-O-W setbacks appear to be met? | |
Bluff setbacks appear to be met? | |
Septic Tank setback appears to be met with/without an engineer's report? | |
Septic Drainfield setback appears to be met with/without an engineer's report? | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? |
Inspector Checklist
Zoning Inspector: | |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? |