SSTS Operating Permit Permit # OP 2024-57, App. # 2024-001752, UID # 211893
App. Status: Approved
Valid: 08/23/2024 - 09/30/2025
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Applicant Information

Are you the property owner? Yes

Facility Information

Permit Type:
Initial Application
Permittee Contact Information (property owner):
Name:
Todd & Joy Inglett
Phone:
(507244 - 1958
Email Address:
joyinglett@gmail.com
Mailing Address:
5465 Highland Ridge Lane SE
Rochester MN 55904
Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
38-0-00230015584 180TH AVE
FINLAYSON MN 55735
WILLIAMS TWPS:2 T:43 R:23INGLETT, TODD A & JOY MINGLETT, TODD A & JOY M
System Type: Type 3
Treatment Level: Not Applicable
Residential/Commercial: Residential
System Design Flow (gpd): 450
System Description:
From the septic designer Soderdstrom "I have sized the system for a 3-bedroom home with more than two water using appliances. The
septic tank will be a 2,000-gallon combination tank. The pump that is required for this system
must have the ability to deliver 29 gpm with at least 19.6 feet of head. The soil treatment area
will utilize a type III mound pressure distribution system."

Service Provider

Attach Signed Maintenance Contract:
Select your Service Provider/Inspector/Maintainer:
NameLicense #ExpirationPhoneAddressInspectorInstallerMaintainerService Provider
Soderstrom Septic LLCL414604/14/2024320-515-10812267 210th Ave, Mora MN 55051YesYesYesNo
Soderstrom Septic LLCL414604/14/2025320-515-10812267 210th Ave, Mora MN 55051YesYesYesNo
Service Provider Email: soderstromseptic@gmail.com

Monitoring Requirements

Monitoring Requirements:
ParameterEffluent LimitsFrequencyLocation
*Design Flow (gpd)450 GPDMonthlyEvent Counter
*Ponding/Surfacing in Soil TreatmentNone AllowedAnnuallyDrainfield
Monitoring Requirements Comments:
Owner to record event counter readings each month.

Maintenance Requirements

Maintenance Requirements:
System ComponentMaintenanceFrequency
*Septic Tank/Trash TankCheck sludge and scum levels, pump if necessaryAnnually
*Pump Tank and ControlsCheck and calibrate if neededAnnually
*Soil Treatment and DispersalMow twice a year and check for ponding/surfacingAnnually

Terms

Monitoring Protocol
  • Any sampling and laboratory testing procedures shall be performed in accordance with the proprietary treatment product's protocol, Standard Methods, and at a Minnesota Department of Health approved laboratory. Results shall be submitted to the permitting authority at: Aitkin County Environmental Services, 307 2nd St NW, Room 219, Aitkin, MN 56431 no later than the expiration date listed.

Contingency Plan
  • In the event the wastewater treatment system does not meet required performance requirements as contained in this operating permit, the owner shall notify Aitkin County Environmental Services within thirty (30) days of receiving non-compliant information. The owner is responsible to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed Service Provider or other qualified practitioner to complete the required corrective measures

Authorization
  • Aitkin County Environmental Services authorizes the Permittee to operate a wastewater treatment and dispersal system at the address named above in accordance with the requirements of this operating permit, attached Management Plan and contract with the Service Provider/Inspector.

    This permit is effective on the issuance date identified above. This permit and the authorization to treat and disperse wastewater shall expire on the expiration date identified above. The Permittee is not authorized to discharge after the above date of expiration. The Permittee shall submit monitoring information on forms as required by Aitkin County Environmental Services no later than thirty (30) days prior to the above date of expiration for operating permit renewal. This permit is not transferable.

    The owner is required to obtain the services of a Minnesota Pollution Control Agency (MPCA) licensed and trained: 1) Service Provider or Inspector to provide ongoing system operation, maintenance, and monitoring and 2) Maintainer to pump the system's sewage tanks and components. The owner is responsible to provide the name of the Service Provider or Inspector business prior to the issuance of this operating permit. The owner has secured the services of [Named in Section 3] as the Service Provider or Inspector for this system. The Service Provider or Inspector is hereby authorized to provide the required monitoring data and routine maintenance service records to Aitkin County Environmental Services.

    [For systems that generate high strength wastewater, the following items should be added to the operating permit: 'If there is a change of use within the facility (i.e., change in menu, increase in food capacity, change in water use fixtures, etc.), the permittee is required to notify Aitkin County Environmental Services and the Service Provider before any changes occurs. Changes to the facility that could potentially impact performance of the wastewater treatment and dispersal system shall not take place until appropriate evaluation has been completed.']

    I hereby certify with my signature as the Permittee that I understand the provisions of the wastewater treatment and dispersal system operating permit including maintenance and monitoring requirements. I agree to indemnify and hold Aitkin County harmless from all loss, damages, costs and charges that may be incurred by the use of this system. I acknowledge that by submitting this application, the application and its attachments are public information. If I fail to comply with the provisions of this operation permit, I understand that penalties may be issued. If I sell this property during the life of the permit, I will inform the new owner(s) of the permit requirements and the need to renew the operating permit.

Invoice #61117 (08/20/2024)

Charge Cost Quantity Total
Non-Taxable
added 07/22/2024 12:54 PM

$150.00 x 1 $150.00
Grand Total
Total $150.00
Payment 08/20/2024$150.00
Due$0.00

Approvals

ApprovalSignature
ApplicantTodd & Joy Inglett - 08/23/2024 9:24 AM - witnessed by Connor Plagge
95d867d6864dd48842dee4be7dc6e2be
3cccdac7993f7a7688b274999e9a3ee6
#1 Planning & Zoning ApprovalConnor Plagge - 08/23/2024 9:25 AM
7595647ac0ad0d1aea18fcaaa943efc3
ad0cef1ea2fc83aaa4652b317d57bc5e
Application has been approved. All signatures have been obtained.

Public Notes

Public Notes:
OP 2024-57
Attachments:
Expiration Date: 09/30/2025
Powered by