OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Are you the Property Owner? | No | ||||||||||||||||||||||||||||||||
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Property Owner Email: | jen@ci.aitkin.mn.us |
Property Owner Contact
Property Owner Email Address: | jen@ci.aitkin.mn.us |
Project Location Search
Property: |
|
Project Description
Please attach all supporting documents and drawings.: | |
Please describe the purposed of the application: | The goal of this project is to install two 4-box Precision Approach Path Indicator (PAPI) systems and changing location for Runway End Identifier Lights (REIL) at each end of runway. The construction of the PAPI system involves bringing material in for the base of the concrete pad, grading of the area, adding a concrete pad for the PAPI system to sit on and installing a new electric line to power the lights (Figure 2). The new electric line will cross the runway once and will be installed through horizontal directional drilling. The current system-Visual Approach Path Indicator (VASI) is not up to Federal Aviation Administration (FAA) standard for VGSI systems. The 4-box Precision Approach Path Indicator (PAPI) is a critical system that is used by pilots to measure their glide slope for landing. Therefore, it is crucial that this system is replaced for increased safety measures. |
Please select all that apply: | Wetland Replacement Plan |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
I acknowledge that by submitting this application, the application and its attachments are public information.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #60305 (04/17/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/17/2024 9:16 AM | $400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 04/23/2024 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Addeline R. Theis - 04/17/2024 9:16 AM 0626ceafd301a58170fd606dd50ef22a a06525198de34af54aedb995c84b2a39 | |
#1 Administrative Staff | Henry Egland - 05/01/2024 8:56 AM 315eea675675dd265a9e0e52210f0431 c030b119a2f613d8a205913acb1970ec | |
#2 Inspectors Group | Henry Egland - 05/01/2024 8:56 AM 0acb9eda6ee4b5d365d56b1ea4fee55a eedf14863b90f4cd703235fec7062009 |
Text: | Approved for Wetland Replacement |
File(s): |
Text: | |
File(s): |
Date application was complete: | 04/17/2024 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Is this an After-The-Fact application? | No |
Zoning Inspector: | Henry Egland |
Attach any necessary inspection forms: | |
Was an onsite conducted for this application? | No |