OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | 13 miles se of aitkin on hwy 47, turn left on nut hatch Ave. Approx a mile and a half in the NE direction |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | No |
Project Description
Please describe your proposed project: | 15 x16 structure for cooking maple sap into syrup for family and friend use. Also a ramp over a low area to lessen the atv damage while collecting sap. |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 240 ft2 |
Item 2- Structure Type (if applicable): | Deck/Patio |
Item 2 - Size: | 150 ft2 |
Site Plan
Please include all applicable items from the checklist on your site plan. See example site plan below: | All Existing Structures & Dimensions All Proposed Structures & Dimensions Location of Septic System(s) Distance of Proposed Structures to OHWL (closest point) Distance of Proposed Structures to Septic System(s) Distance of Proposed Structures to Property Lines Distance of Proposed Structures to Road Right-of-Way Distance of Proposed Structures to Alley or Boulevard Distance of Proposed Structure to Top of Bluff |
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
Check boardwalk on property. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit is approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #59225 (01/24/2024)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 01/18/2024 7:53 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
added 01/18/2024 7:53 PM $100 Flat Fee |
$100.00 | x 1 | $100.00 |
Grand Total | |||
Total | $300.00 | ||
Payment 01/24/2024 | $300.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Allen B Haugen - 01/24/2024 10:04 AM - witnessed by Connor Plagge 916385da980f70794fdde6c76f79b920 47444a01ac042ab37e0016b783861f61 | |
#1 Adminstrative Approval Group | Connor Plagge - 01/25/2024 9:57 AM 2631d93703a8d6be9f4d01b1cbe195e0 7f96f516fea5b91bc05681d78d34d323 | |
#2 Inspector Group | Connor Plagge - 01/25/2024 4:21 PM 5cdc0fd9d246cdc9010f32b881835c8e 7935e50fa13087c6683304d902d31953 | |
#3 Level Three Final Action | Connor Plagge - 01/26/2024 8:38 AM 81885f16118bce881abf4764a5e307c7 2bab41b1d737aeec4622df35b28a1ce5 |
Text: | Permit #48446 Approved for a 240 sq ft Accessory Building and a 150 sq ft Deck (Bridge for ATV Access over low area) Not for human habitation. Not for commercial use. Not to be enclosed. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 01/24/2024 |
Review started by: | Connor Plagge |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | Yes |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | New Construction |
Is this After-The-Fact? | Yes |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Connor Plagge |
Attach necessary inspection forms/photos: |
|
Notes: | |
Was an onsite conducted for this application? | Yes |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |