OneGov
App. Status: Approved
Valid: 02/02/2024 - 02/01/2025Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Septic Type
Select the system you are applying for: | Residential Other/Performance (Type 3) |
Design Information
Attach Septic Design & Management Plan: | |
Designer Name: |
|
Operating Permit
Attach the Operating Permit Application & Maintenance Contract: |
|
Installer
Self Install or Licensed Install?: | Self (unlicensed property owner) |
Indemnification
If this is a self install by the property owner, please attach the completed indemnification form: |
Terms
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Property lines, septic sites, wells, and road right-of-ways must be clearly defined with flags, ribbon, or lathe prior to onsite inspection by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #58967 (11/06/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/27/2023 9:14 PM | $100.00 | x 1 | $100.00 |
added 10/27/2023 9:14 PM | $150.00 | x 1 | $150.00 |
added 10/27/2023 9:14 PM | $400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $650.00 | ||
Payment 11/06/2023 | $650.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Ron Klatke - 02/02/2024 1:00 PM - witnessed by Henry Egland c86c637c874c4ceef3905176db22d07d c20e7e0f91a12fa4fb015dadbdad7f7b | |
#1 Adminstrative Approval Group | Henry Egland - 02/02/2024 1:01 PM 9fd20568e0530f91444e6964102591eb 1293631386bbb7f2b27ba666827a2b96 | |
#3 Final Approval | Connor Plagge - 02/02/2024 2:25 PM b96df67b2e54dd0e76c094f9e00a3762 01cda19dd48840ac78dab95585b5938d | |
#2 Inspector Group | Henry Egland - 02/02/2024 1:03 PM 520889f64012ef3df47261a083df9d18 9f10ab785a4967478dbad1c3dc91468a |
Text: | Permit #48455 Approved for Type III 4 bdrm mound with operating permit #882 with two (2) conditions; 1. Landowner must contact Planning & Zoning at least 24 hrs prior to installation. 2. Landowner statement and contractor responsibility form (Attached) should be filled and and returned to the Aitkin County Wetland Specialist prior to construction. operating permit approved 2/2/24. sw |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 02/02/2024 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | 75 ft. |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Design Reviewed By: | Henry Egland |
SSTS Type: | Type III |
SSTS Design: | "Other"/Performance System (III, IV, V) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 2,500-4,999 gpd |
# of bedrooms: | 4 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | Yes |
Operating Permit #: | 882 |
Additional info (optional): |
Self Install? | |
Installer Name: |
None
|
# of New Tanks: | |
# of Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: |