Land Use Application Permit # 2023-1010, App. # App-2023-001145, UID # 209104
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
andrew meysembourg
Phone:
(612615 - 6783
Email Address:
58andy@frontier.com
Mailing Address:
16969 Kirby Ave N
HUGO MN 55038
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
36-1-08360037633 CLOVER ST
AITKIN MN 56431
WEALTHWOOD TWPWEALTHWOOD GOLF ESTATESS:0 T:0 R:0MEYSEMBOURG, ANDREW J & LINNAE LMEYSEMBOURG, ANDREW J & LINNAE L

Project Checklist

1.) Is the property zoned Shoreland? No
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
No
6.) Are you applying to install a new septic system? No

Project Description

Please describe your proposed project:
12x36 park model to be moved on to the property. Site is staked out. We have purchased a " poo pod " recycle pooper .     We are sending a sales slip with our site plan of location of RV.  We would like to text a picture of pooper if possible. We have trouble with our email service.   thanks    Linn and Andy   This property is a week end use only.

Project Type

Item 1 - Structure Type: New Residence incl. attached decks/porches/garages
Item 1 - Size: 432 ft2

Site Plan

Please include all applicable items from the checklist on your site plan. See example site plan below:
All Existing Structures & Dimensions
All Proposed Structures & Dimensions
Location of Driveways & Access Roads
Distance of Proposed Structures to OHWL (closest point)
Distance of Proposed Structures to Property Lines
Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit is approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #58789 (10/02/2023)

Charge Cost Quantity Total
Non-Taxable
added 09/29/2023 10:22 AM

$300 Flat Fee

$300.00 x 1 $300.00
Grand Total
Total $300.00
Payment 10/02/2023$300.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantAndy Meysembourg - 10/02/2023 2:09 PM - witnessed by Henry Egland
a4d9d3c646e739874d9787f2998901d6
b33bd0bfa154a83abe1462b1b27e5f78
 
#1 Adminstrative Approval GroupBrock Anderson - 10/03/2023 9:37 AM
d44ffd533a693dcb7c5ae0a5b494fe6e
a8c4145deaecaa63b93222eba124a35c
 
#2 Inspector GroupBrock Anderson - 10/05/2023 9:47 AM
02fcfb3b31c88c184d51b56ea77d5139
643a23e100af81e0d2fead7716ee9df5
 
#3 Level Three Final ActionConnor Plagge - 10/05/2023 10:45 AM
9a2d664739b8e6e55eaa456651067f95
52326abdc15fc0f9167a659305d6ffb9
 
Application has been approved. All signatures have been obtained.
Text:
Permit #48271

Approved for 
 -432 sf New Residence
  (12x36 park model)

 -Condition: 
   Send picture of compost toilet hooked up within a year
File(s):
Text:
If area looks low or if questions of "is it a wetland" persist on site please keep me in the loop. - HE
File(s):
    Date application was complete: 10/02/2023
    Review started by: Brock Anderson
    Zoning District of project location:
    Required OWHL setback distance:
    "Other" OHWL setback distance is:
    Project located in the floodplain? No
    Base Flood Elevation:
    Lowest Floor Elevation:
    Is an after construction elevation certificate required?
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? N/A
    Septic Tank setback appears to be met with/without an engineer's report? N/A
    Septic Drainfield setback appears to be met with/without an engineer's report? N/A
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? Redevelopment
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector: Brock Anderson
      Attach necessary inspection forms/photos:
      Notes:
      Was an onsite conducted for this application? Yes
      Self Install?
      Installer Name:
      None
      New Tanks:
      Existing Tanks:
      Date of Final Inspection:
      Attach Final Certificate of Installation:
        Low Interest Loan or SSTS Grant project?
        Powered by