Land Use Application Permit # 2023-0993, App. # App-2023-001026, UID # 208928
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Matt Enderle
Phone:
(218820 - 5607
Email Address:
enderle@frontiernet.net
Mailing Address:
18597 488th lane
McGregor MN 55760
Are you the Property Owner? No

Property Owner Contact

Property Owner Email: seth@eurotechmn.com
Property Owner Phone:
(651285 - 3617

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
39-0-03910048352 241st Pl
MCGREGOR, MN 55760
WORKMAN TWPS:22 T:49 R:24RDRAT LAKETHORSON, SETH CTHORSON, SETH C

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
adding on a porch 16' ft by 21'ft  and 8' ft by 8'ft  ( 3 season Porch ) 
287 sq feet of deck includes 2 sets of steps
see attached drawings

Project Type

Item 1 - Structure Type: Residence Addition
Item 1 - Size: 336 ft2
Item 2- Structure Type (if applicable): Deck/Patio
Item 2 - Size: 287 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 250 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 10 CuYd
How close to the property line will any fill be placed or any excavation be done? 100 Feet
What percent slope of the land currently exists on the project site? 1 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
Seeding and/or Mulching
Tree Planting
Other:
grass will be planted.

Site Plan

Please include all applicable items from the checklist on your site plan. See example site plan below:
All Existing Structures & Dimensions
All Proposed Structures & Dimensions
Location of Driveways & Access Roads
Location of Well(s)
Location of Septic System(s)
Distance of Proposed Structures to Septic System(s)
Distance of Proposed Structures to Property Lines
Distance of Proposed Structures to Road Right-of-Way
Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
see attached drawings

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit is approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #58619 (09/11/2023)

Charge Cost Quantity Total
Non-Taxable
added 09/19/2023 12:17 PM

$300 Flat Fee

$300.00 x 1 $300.00
added 09/19/2023 12:17 PM

$150 Flat Fee

$150.00 x 1 $150.00
Grand Total
Total $450.00
Payment 09/11/2023$150.00
Payment 09/19/2023$300.00
Due$0.00

Approvals

ApprovalSignature
ApplicantMatt j. enderle - 09/11/2023 3:15 PM
197a24024644f4dc30fa3378e5a8a1f5
204d9bc5a326d652da3216b0a8f058c9
#1 Adminstrative Approval GroupKevin Turnock - 10/02/2023 2:44 PM
ce30177e2cf1013f83d24241e8836d4d
17a0a9f25052c055e019caec15c4fec6
#2 Inspector GroupKevin Turnock - 10/02/2023 2:44 PM
51e6035bfffa7fce11585d2d66fefe73
2fc7909be5f33f8c93e62f10e6bd3490
#3 Level Three Final ActionConnor Plagge - 10/03/2023 3:06 PM
7fadec4e3427d00c77456e60c0053179
c99cff0fb85f22f7ea05a0cad8c8017b
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #48257

Approved for a 336 ft2 residence addition and 287 ft2 deck
File(s):

Admin Checklist

Date application was complete: 09/19/2023
Review started by: Kevin Turnock
Zoning District of project location: Shoreland
Required OWHL setback distance: 100 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? Redevelopment
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Kevin Turnock
Attach necessary inspection forms/photos:
    Notes:
    Meeting setbacks
    Was an onsite conducted for this application? Yes
    Powered by