Septic Only Permit # 2023-0524, App. # App-2023-000632, UID # 208239
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Applicant contact information:
Name:
Larry Liljenquist
Phone:
(218218 - 8886
Email Address:
liljenquistsewer@yahoo.com
Mailing Address:
30477 STATE HWY 47
AITKIN MN 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Phone:
(218820 - 8886
Property Owner Email: liljenquistsewer@yahoo.com

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
21-0-05340022100 320th Ave
AITKIN, MN 56431
MALMO TWPS:33 T:45 R:25NEDEER LAKEDEER LAKE FARMSTEAD, LLCDEER LAKE FARMSTEAD, LLC
Enter directions to the property (if no address assigned):
Aprox 20 miles south of Aitkin on State Hwy 47.  Location in Malmo. Please use your GPS.  Brian and Connor have been to this location.

Septic Type

Select the system you are applying for:
Commercial/Cluster 1001-2500 gallons/day

Design Information

Attach Septic Design & Management Plan:
Designer Name:
NameLicense #ExpirationPhoneAddressDesigner
Liljenquist Sewer & Excavating, Inc.L12703/31/2024320-684-2024 29800 310th Pl, Aitkin MN 56431Yes

Installer

Self Install or Licensed Install?: Licensed Septic Installer
Licensed Installer Name:
NameLicense #ExpirationPhoneAddressInspectorInstallerMaintainerService Provider
Liljenquist Sewer & Excavating, Inc.L12703/31/2024320-684-2024 29800 310th Pl, Aitkin MN 56431NoYesNoNo

Terms

Septic Permit General Terms & Conditions
  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • Property lines, septic sites, wells, and road right-of-ways must be clearly defined with flags, ribbon, or lathe prior to onsite inspection by Aitkin County.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #57946 (06/29/2023)

Charge Cost Quantity Total
Non-Taxable
added 06/29/2023 9:35 AM

$1,000.00 x 1 $1,000.00
Grand Total
Total $1,000.00
Payment 06/29/2023$1,000.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantLarry Liljenquist - 06/29/2023 9:36 AM
1ebddddc2c74878a47de31cbe9f40334
0711429bab90c3d2b41e6fef34c36dd7
 
#1 Adminstrative Approval GroupShannon Wiebusch - 06/29/2023 9:52 AM
200c811a85b0f710a91208f4722540fc
c698b0c3d95382568fde1782d63625fa
 
#3 Final ApprovalConnor Plagge - 07/03/2023 11:27 AM
3e47adacc83a23a05a1c101da3bdb209
d41c25e5b1d00140cd7ce359dcc515fb
 
#2 Inspector GroupKevin Turnock - 06/29/2023 3:07 PM
7a40012dff4a329e42a3e5f22f7d3a30
2ff85cfdff1a13d7225b09e33dedcf0d
 
Application has been approved. All signatures have been obtained.
Text:
Permit #47919

Approved for One 1000 gpd Type I pressure bed commercial septic. (East system) and 
One 900 gpd Type I pressure bed commercial septic (West system)
File(s):
Text:
File(s):
    Date application was complete: 06/29/2023
    This review has been started by: Shannon Wiebusch
    Zoning District of project location: Shoreland
    Required OHWL setback distance:
    "Other" OHWL setback distance is:
    Pumping Agreement Attached?
    Low Interest Loan or SSTS Grant project?
    Is this an After-The-Fact application? No
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Design Reviewed By: Kevin Turnock
    SSTS Type: Type I
    SSTS Design: Pressure Bed/Seepage
    New or Replacement SSTS: New SSTS
    GPD: 1-2,499 gpd
    # of bedrooms:
    Is this a Cluster System? Yes
    Does this system belong to an Other Establishment? Yes
    Does this system require an Operating Permit? No
    Operating Permit #:
    Additional info (optional):
      Self Install?
      Installer Name:
      NameLicense #ExpirationPhoneAddressInspectorInstallerMaintainerService Provider
      Liljenquist Sewer & Excavating, Inc.L12703/31/2024320-684-2024 29800 310th Pl, Aitkin MN 56431NoYesNoNo
      # of New Tanks: 3
      # of Existing Tanks: 0
      Date of Final Inspection: 08/25/2023
      Attach Final Certificate of Installation:
      Powered by