OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone: |
|
||||
Property Owner Email: | westerlund@frontiernet.net |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | From Aitkin, travel south on HWY 47 approx. 24.5 miles to 183rd St., turn east on 183 about 1/4 mile to address on south side of road. |
Septic Type
Select the system you are applying for: | Residential Mound (Type 1) |
Design Information
Attach Septic Design & Management Plan: |
|
Designer Name: |
None
|
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License Number: | L663 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #55515 (06/29/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/29/2022 8:49 AM | $350.00 | x 1 | $350.00 |
Grand Total | |||
Total | $350.00 | ||
Payment 07/08/2022 | $350.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Greg Westerlund - 06/29/2022 8:50 AM a0d08133c9fac447affe910b86a9126e 601cc98fdcac9913b3c28b0b1b9865ed | |
#1 Adminstrative Approval Group | Molly Oestreich - 07/12/2022 8:36 AM 3bedadde6686185c1046af5b8be54f3d 18578aee2eac632529fb7c41afd5bbeb | |
#3 Final Approval | Sarah McMillan - 07/19/2022 9:26 AM dae38e1d2a018e394bb35cc0e9eaa8c2 8c8a2e53132a70813285ea530f64b5c1 | |
#2 Inspector Group | Kevin Turnock - 07/19/2022 8:36 AM bfb778dbaef4dcdd54d6c0e3584ee376 16158fe3f764c0076da966da942777be |
Text: | Permit #47118 2 bdrm Type I mound septic. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 07/08/2022 |
This review has been started by: | Molly Oestreich |
Zoning District of project location: | Open |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? |
Design Reviewed By: | Kevin Turnock |
SSTS Type: | Type I |
SSTS Design: | Mound (Type I) |
New or Replacement SSTS: | New SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 2 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |
Self Install? | |
Installer Name: |
None
|
# of New Tanks: | |
# of Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: |