Land Use Application Permit # 47159, App. # App-2022-009095, UID # 205686
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Michael Lang
Phone:
(320250 - 8335
Email Address:
michael@paragonhomesmn.com
Mailing Address:
18947 225th Street
Richmond MN 56368
Are you the Property Owner? No

Property Owner Contact

Property Owner Email: bueltim@me.com
Property Owner Phone:
(651341 - 4562

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-32550049542 202nd Pl
MCGREGOR, MN 55760
SHAMROCK TWPBELLHORN HEIGHTSS:17 T:49 R:23GDBIG SANDY LAKEBUEL, TIMOTHY & ANITABUEL, TIMOTHY & ANITA
Enter directions to the property (if no property address assigned):
leave Aitkin and travel to McGregor using Voyageur Hwy #169
turn right on to #210 towards McGregor
turn left on to #65
turn right on to 'Lake Ave'
turn left on to '202nd Place' (at curve leading to 'Red Rock Bar')
property on your right '#49542'

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? Yes
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
proposed building is a detached 21' x 21' with 10' side wall height shed to store home owners vehicles, lawnmower, snow blower, trash cans and miscellaneous tools
What is the height of your structure? 14 Feet

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 441 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 160 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 8 CuYd
How close to the property line will any fill be placed or any excavation be done? 160 Feet
What percent slope of the land currently exists on the project site? 3 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
plant vegetation (grass)

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #55470 (06/26/2022)

Charge Cost Quantity Total
Non-Taxable
added 06/26/2022 1:00 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 06/26/2022$200.00
Due$0.00

Approvals

ApprovalSignature
ApplicantMichael J. Lang - 07/22/2022 3:57 AM
e72da1513875b13195e6afd143e14bf1
a0f025f7c5e17384c6de94fbb03e2790
#1 Adminstrative Approval GroupConnor Plagge - 07/28/2022 2:22 PM
e65f469a76a8ad827099d3fba99c246f
f1b55b565e448c05158075f26c453c35
#2 Inspector GroupConnor Plagge - 07/28/2022 2:22 PM
d51cf1fe2452fb8859e554476a5c77a0
3ad0117144ec7a9612234b70f1163bf4
#3 Level Three Final ActionSarah McMillan - 07/28/2022 2:58 PM
58984f39df30a9342bea165ba0396727
9a650e58e2ea1b455a965e948baf0c4c
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #47159
Approved for a 441 sq ft Accessory Structure.
File(s):

Admin Checklist

Date application was complete: 07/22/2022
Review started by: Connor Plagge
Zoning District of project location: Shoreland
Required OWHL setback distance: 75 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? No
Bluff setbacks appear to be met? Yes
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Connor Plagge
Attach necessary inspection forms/photos:
Notes:
Need to check if marked ROW was accurate. Every other setback appears to be met. 

4x8 shed was remodeled with new outside wood. Shown on site plan back in 1984.
Was an onsite conducted for this application? Yes
Powered by