Land Use Application Permit # 47159, App. # App-2022-009095, UID # 205686
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219, Aitkin, MN 56431
Email: aitkinpz@aitkincountymn.gov
Phone: 218-927-7342
Fax: 218-927-4372
 

Property Location

Property Location:
Property LocationLegal Description
Parcel NumberProperty AddressTownship or City NameOwner Name(s)Taxpayer Name(s)Legal DescriptionPlat NameSection-Township-Range
29-1-32550049542 202nd Pl
MCGREGOR, MN 55760
SHAMROCK TWPBUEL, TIMOTHY & ANITABUEL, TIMOTHY & ANITABELLHORN HEIGHTSS:17 T:49 R:23

Site Plan

Attach Site Plan:

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • Permit fees are non-refundable after a permit has been approved.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

Invoice #55470 (06/26/2022)

Charge Cost Quantity Total
Non-Taxable
added 06/26/2022 1:00 AM

$200 Flat Fee

$200.00 x 1 $200.00
Grand Total
Total $200.00
Payment 06/26/2022$200.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantMichael J. Lang - 07/22/2022 3:57 AM
e72da1513875b13195e6afd143e14bf1
a0f025f7c5e17384c6de94fbb03e2790
 
#1 Adminstrative Approval GroupConnor Plagge - 07/28/2022 2:22 PM
e65f469a76a8ad827099d3fba99c246f
f1b55b565e448c05158075f26c453c35
 
#2 Inspector GroupConnor Plagge - 07/28/2022 2:22 PM
d51cf1fe2452fb8859e554476a5c77a0
3ad0117144ec7a9612234b70f1163bf4
 
#3 Level Three Final ActionSarah McMillan - 07/28/2022 2:58 PM
58984f39df30a9342bea165ba0396727
9a650e58e2ea1b455a965e948baf0c4c
 
Application has been approved. All signatures have been obtained.
Powered by