OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | maryzabel80@gmail.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Turn onto US-169 S/Minnesota Ave N Continue to follow US-169 S 1.1 mi At the traffic circle, continue straight to stay on US-169 S 1.0 mi Turn right onto 416th Ave 1.2 mi Turn right onto Daisy St 1.9 mi Turn left onto 325th Ln Destination will be on the right 0.2 mi 43007 325th Ln Aitkin, MN 56431 |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | New construction slab on grade home and attached garage per plans # 21272 Approx. 1600 SF main level home plus 308 SF upper level and attached 26 x 24 garage with 7 x 15 mechanical room. Overall footprint box is 67 x 50 One of the homes that is showing on the GIS has been removed. |
What is the height of your structure? | 21 Feet |
Project Type
Item 1 - Structure Type: | New Residence incl. attached decks/porches/garages |
Item 1 - Size: | 2904 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 120 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 65 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 40 Feet |
What percent slope of the land currently exists on the project site? | 5 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Homeowner will reseed before silt fence is removed |
Site Plan
Attach Site Plan: | |
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
Blueprint of home and garage to be built. There was an existing mobile home in the location that the new home is planning to be constructed. Also, the Septic Code Compliance should be good for 5 years from the date of installation? We were told it was installed in 2019, Operating Permit #498, see attached Compliance Certificate an attachments. |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Permit fees are non-refundable after a permit has been approved.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
I acknowledge that by submitting this application, the application and its attachments are public information.
Invoice #55183 (06/02/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/25/2022 4:38 PM $550 Flat Fee |
$550.00 | x 1 | $550.00 |
Grand Total | |||
Total | $550.00 | ||
Payment 06/02/2022 | $550.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Gary J. Knisley - 07/12/2022 7:20 PM a64f5f0a58c8dfd17853fcf213977f61 b5d70152bfa872b2b1857f59a906ffd2 |
#1 Adminstrative Approval Group | Connor Plagge - 07/22/2022 9:59 AM 23844da8febd6ac24462bc1e735c4ba3 f95affd6346b463392827058a385ebb1 |
#2 Inspector Group | Connor Plagge - 07/22/2022 10:04 AM bcf760ce729e00b63b34c51319007ac3 190e9f5ccd36b57515c8253d25b07736 |
#3 Level Three Final Action | Kim Burton - 07/22/2022 12:31 PM 18b1ddb89fecde1e86ead87ec544bee7 40c0a09794a4ac7c84d8179e43c645e5 |
Public Notes
Text: | Permit #47143 Approved for a 2904 sqft New Residence incl. attached decks/porches/garages |
File(s): |
|
Admin Checklist
Date application was complete: | 07/12/2022 |
Review started by: | Molly Oestreich |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Connor Plagge |
Attach necessary inspection forms/photos: |
|
Notes: | Over 100 feet to OHWL. 30 feet to septic tanks 21' to property line. |
Was an onsite conducted for this application? | Yes |