Land Use Application Permit # 47099, App. # App-2022-009190, UID # 205050
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Jody CLAASSEN
Phone:
(715781 - 0212
Email Address:
jody@brisonmfg.com
Mailing Address:
2291 60th Ave
OSCEOLA WI 54020
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
16-1-06330021419 324th Pl
ISLE, MN 56342
LAKESIDE TWPSWEDBERGS ADDITIONS:5 T:44 R:25GDMILLE LACSCLAASSEN, BRIAN & JODYCLAASSEN, BRIAN & JODY
Enter directions to the property (if no property address assigned):
South on Hwy 47 to Malmo.  From Malmo go south on 47 to 215th Lane (Castaways resort) turn right.  Turn left on 324th Place and go down until you get to 21419 324th Pl.  (Red Cabin)

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes
6.) Are you applying to install a new septic system? No

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
I am proposing to put a 10 x 30 including a 5 x 14 covered deck and an 8 x 40 addition to our cabin.  This will be somewhat of an L shape addition to existing cabin to square it off.
What is the height of your structure? 13 Feet

Project Type

Item 1 - Structure Type: Residence Addition
Item 1 - Size: 550 ft2
Item 2- Structure Type (if applicable): Deck/Patio
Item 2 - Size: 70 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 160 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 59 CuYd
How close to the property line will any fill be placed or any excavation be done? 20 Feet
What percent slope of the land currently exists on the project site? 3 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
reseed or sod as soon as possible

Site Plan

Attach Site Plan:
Is the site staked and ready for inspection? Yes

Additional Info

Additional info:
(optional)
Variance permit has been approved on July 6th.
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information)

Terms

Land Use/Septic Terms & Conditions
  • All appropriate permit fees must be paid in full prior to any necessary review(s) of application.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Permit fees are non-refundable after a permit has been approved.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • I acknowledge that by submitting this application, the application and its attachments are public information.

Invoice #54852 (07/13/2022)

Charge Cost Quantity Total
Non-Taxable
added 07/13/2022 3:19 PM

$400 Flat Fee

$400.00 x 1 $400.00
added 07/13/2022 3:19 PM

$100 Flat Fee

$100.00 x 1 $100.00
Grand Total
Total $500.00
Payment 07/13/2022$500.00
Due$0.00

Approvals

ApprovalSignature
ApplicantJody CLAASSEN - 07/13/2022 3:20 PM
cc55ee5b8302a9f6261bfd6582364619
f96b5930b297321e561dbafdaae17517
#1 Adminstrative Approval GroupKim Burton - 07/13/2022 3:33 PM
84cd7edd10601ac2d20f3731ace60362
d48bdf52f078f5f632393ef48b0fbc0b
#2 Inspector GroupKim Burton - 07/14/2022 11:18 AM
f5a9d71af8f199d6c4fda19d4258790d
a7b1e3e03ebb8af36fbc9479594cfbda
#3 Level Three Final ActionSarah McMillan - 07/14/2022 11:31 AM
8899e8eb0d3df31d99a1e8cebd23a0d0
f962ed3ee1e09fb542a6e623ab10c297
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Permit #47099
Approved for a 604 sq ft residence addition and a 14X5 covered deck per variance # 47085V.
File(s):

Admin Checklist

Date application was complete: 07/13/2022
Review started by: Kim Burton
Zoning District of project location: Shoreland
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain?
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met?
Road R-O-W setbacks appear to be met?
Bluff setbacks appear to be met?
Septic Tank setback appears to be met with/without an engineer's report?
Septic Drainfield setback appears to be met with/without an engineer's report?
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified?
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact?

Inspector Checklist

Zoning Inspector: Kim Burton
Attach necessary inspection forms/photos:
    Notes:
    per variance # 47085V.
    Was an onsite conducted for this application? Yes
    Powered by