App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | From McGregor head north on HWY 65 about 25 miles and turn right on to Loon Ave. Go 1.7 miles and turn left on to 637th Lane. Go 0.9 miles and head northeast on to 183rd Place. Driveway is at the top of the hill on the left. Property address is 63636 183rd Place. |
Project Description
Please describe your proposed project: | I'm looking to create at pathway down to the lake edge for access to a dock. The path would follow the natural contour and slope of the land and be cut into the side of the hill. The path would be approximately 8' wide x 55' long. Could be around 20 yards of materials being moved. If it is cut into the side hill I'm guessing the upper slope could have up to a 2' tall bank. Once the path is made I would try to establish vegetation on the down slope. I would use grass seed, wild flowers, erosion blanket and let it go back to natural. Up slope bank will be sloped back and place erosion blanket to stop erosion. I will install silt fencing along the work area until it is has vegetation growing back. |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 2 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing Hand Clearing |
Please explain: | Use chainsaw to cut down two 5" dimeter trees. Use an excavator to remove the stumps and cut in the path. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Gravel |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 20 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 500 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
Silt fence will be installed while the work on the path is being done and it will be left up until vegetation takes place. The side slopes of the path will be planted with grass seed and or wild flowers to create vegetations. Also plan on using erosion blanket to help hold everything in place while it starts to grow back in. |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #54347 (12/26/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 12/26/2021 2:42 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 12/26/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Ernie Darlow - 12/26/2021 2:49 PM cf4b346ac65ab5e94d29a69ac9444e88 57f1f8140503091abec89f8ccd3166ce | |
#1 Adminstrative Approval Group | Henry Egland - 12/30/2021 8:31 AM e4cb1eb84348c960a7235ed7f28a026e 09b56c27c66791f24e21b142d6ff6c2e | |
#2 Inspector Group | Henry Egland - 12/30/2021 8:38 AM 00816217fc0ad8a23e6735c532f59e73 d0799e2cad9d1afbb8d6b51fbf897971 | |
#3 Final Action | Molly Oestreich - 12/30/2021 9:20 AM 8c1d7b1336230ee1ce1b0abc3b289738 2e3533081f819964d0fc6da233760984 |
Text: | Permit 46685. Approved for pathway to lake which includes 20 cubic yards of earth moving. Erosion control measures to be applied per plan. |
File(s): |
|
Text: | Once Ernie edits his app. to reflect what he and I agreed on. The app will be good to go. - H.E. |
File(s): |
Date application was complete: | 12/26/2021 |
This review has been started by: | Henry Egland |
Zoning District of project location: | Shoreland |
Zoning Inspector: | Henry Egland |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | No |
Was an onsite conducted for this application? | No |
Is this an After-The-Fact application? | No |
Project located in the floodplain? | No |
Base Flood Elevation: |