OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone: |
|
||||
Property Owner Email: | westerlund@frontiernet.net |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | From Aitkin, south on ST. HWY. 47 23 miles to 317th AVE turn west towards lake and follow service road to 19825 on west side of road. |
Septic Type
Select the system you are applying for: | Residential Mound (Type 1) |
Design Information
Attach Septic Design & Management Plan: |
|
Designer Name: |
None
|
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License Number: | L663 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #54030 (10/11/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/11/2021 12:05 PM | $350.00 | x 1 | $350.00 |
Grand Total | |||
Total | $350.00 | ||
Payment 10/13/2021 | $350.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Bruce Maples - 12/21/2021 10:03 AM - witnessed by Shannon Wiebusch c7ab1d6e1da6fd3800ccbf423d331cad 110d744e62f38670e5dc70c841b5c8cb |
#1 Adminstrative Approval Group | Shannon Wiebusch - 12/21/2021 10:04 AM 277d784dbfe59fcdc4e17e73d0b8524a 39aad9fc0b030766bb945f2d9e9e57bc |
#3 Final Approval | Molly Oestreich - 12/21/2021 10:37 AM 2bf40fc3ec6d2a917e5c7901f89012a1 9a992bbed1d7c67109c813de252f4458 |
#2 Inspector Group | Kevin Turnock - 12/21/2021 10:11 AM 2223c991da30c3d1b7ca70d6138ce4f1 88ced7c5405eceda79b20a0c1abe73b4 |
Public Notes
Text: | Permit #46677. Approved for a 2 bdrm Type I mound septic |
File(s): |
|
Admin Checklist
Date application was complete: | 12/21/2021 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | 75 ft. |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
DESIGN REVIEW CHECKLIST
Design Reviewed By: | Kevin Turnock |
SSTS Type: | Type I |
SSTS Design: | Mound (Type I) |
New or Replacement SSTS: | New SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 2 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |