OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | rosatidr@comcast.net | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | Head east on 2nd St NW toward 1st Ave NW Turn right at the 3rd cross street onto US-169 S/Minnesota Ave N At the traffic circle, continue straight to stay on US-169 S Turn right onto 416th Ave Turn right onto Daisy St Turn left onto 420th Pl Turn right onto 425th Pl |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | 40 x 30 House |
What is the height of your structure? | 29 Feet |
Project Type
Item 1 - Structure Type: | New Residence incl. attached decks/porches/garages |
Item 1 - Size: | 1838 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 66 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | Yes |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 0 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 25 Feet |
What percent slope of the land currently exists on the project site? | 10 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
silt fence, re-established natural vegetation |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
The property is ready for inspection, there will be no stakes in the ground, it will be where the existing structure sits. Please note the set back is based on lake averaging. |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
|
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53761 (09/07/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/07/2021 1:03 PM $400 Flat Fee |
$400.00 | x 1 | $400.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 09/07/2021 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Andrew RANWEILER - 09/07/2021 1:05 PM f13da24eee7c7b73dfffa37eba64bf97 d1866a1b3a7fa18c0f0009e29b8e5939 |
#1 Adminstrative Approval Group | Kim Burton - 09/07/2021 2:44 PM 7c883d8a46b3893aa400e2819a4cf388 4a13cf7f593b8624496e0e36ab1cc533 |
#2 Inspector Group | Bryan Hargrave - 09/19/2021 11:56 AM 9b5c8a5fce2469b3032d170165fce7c0 e0948da5d2f19211a08a10fb74a0a731 |
#3 Level Three Final Action | Molly Burman - 09/21/2021 12:15 PM 0148a5bb1f6ab835903664973ca67cf7 a4690154c41b6cb1e6a5e5a45578b9db |
Public Notes
Text: | Permit #46448. Approved for a 44' x 38' new residence with deck and cover porch. Condition: Must tear down the existing cabin. |
File(s): |
|
Admin Checklist
Date application was complete: | 09/07/2021 |
Review started by: | Kim Burton |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | |
Road R-O-W setbacks appear to be met? | |
Bluff setbacks appear to be met? | |
Septic Tank setback appears to be met with/without an engineer's report? | |
Septic Drainfield setback appears to be met with/without an engineer's report? | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: | |
Notes: | Meets all setback requirements using shoreline averaging. Approved for a 44' x 38' new residence (after teardown of existing cabin) with deck and cover porch. |
Was an onsite conducted for this application? | Yes |