App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | 169 North to 210 East to County Rd 5 North-about 5 miles property on right |
Project Description
Please describe your proposed project: | create a boat landing in the middle of the property. approx. dimensions 16' wide by 8' long, 18" deep. it will be dug out tapered upwards, gravel will be brought in to fill in the area. Will remove approx. 5 yards of dirt. and will bring in 5 yards of gravel. |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of alteration. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 0 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing |
Please explain: | bobcat |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Gravel |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 5 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 128 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching Other (explain below) |
If other, please explain: | adding gravel |
Describe how you intend to implement this plan and your finished vegetation plan.: |
add gravel and grass seed |
Terms
All appropriate permit fees must be paid in full prior to any necessary review(s) of application.
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #53657 (08/26/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/26/2021 4:59 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 10/04/2021 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Jeff l. reno - 08/26/2021 5:39 PM cc88e7e7f0e2999ac95ce604f1f2af1d e2e1360dd6c938d029d84d08a851d76d | |
#1 Adminstrative Approval Group | Shannon Wiebusch - 10/04/2021 9:28 AM dc3f6e921c4cc19c556dbd9a14d070dc 4974867ffd0186f1fa01d1c50bcb13e1 |
Text: | Land Alt. permit approved with following conditions - boat landing specifications per applications - concrete plank at base of ramp - alternating strips of gravel and grass above concrete plank |
File(s): |
Text: | |
File(s): |
Date application was complete: | |
This review has been started by: | |
Zoning District of project location: |
Zoning Inspector: | |
Attach necessary inspection forms: | |
Is the project in the Shore Impact Zone? | |
Was an onsite conducted for this application? | |
Is this an After-The-Fact application? | |
Project located in the floodplain? | |
Base Flood Elevation: |