OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | From McGregor, North on Hwy 65, Right on Goshawk St, Left on 188th Ave, just before the Y on left |
Does your property have an E911 address assigned? | Yes |
Septic Type
Select the system you are applying for: | Residential Mound (Type 1) |
Design Information
Attach Septic Design & Management Plan: | |
Designer Name: |
None
|
Installer
Self Install or Licensed Install?: | Self (unlicensed property owner) |
Licensed Installer Name: |
None
|
Indemnification
If this is a self install by the property owner, please attach the completed indemnification form: |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #52370 (04/30/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/30/2021 2:00 PM | $350.00 | x 1 | $350.00 |
Grand Total | |||
Total | $350.00 | ||
Payment 04/30/2021 | $350.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Barbara J. Martz - 04/30/2021 2:05 PM 3b350b237eb9038b5b316feb6a70371f b41144a414ab8c6d68b858acdb4576ab | |
#1 Adminstrative Approval Group | Shannon Westerlund - 04/30/2021 4:16 PM a874e94217eda9d863e232035d3b8877 8d33a40de2ba5a85525704f6af433402 | |
#3 Final Approval | Karin Martinjako - 05/06/2021 2:29 PM d1c0e035b21efe177be93b5ae27b1d99 cd097db7fb23333779192a42c55be740 | |
#2 Inspector Group | Kevin Turnock - 05/06/2021 2:03 PM 25eef7672aa81c44d2ed022f626c30a1 fb43ec704a4389e74a66c35230990737 |
Text: | Permit 45940. Approved for a 2 bdrm Type I mound septic. Homeowner must set up inspection schedule prior to commencing work. |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | 04/30/2021 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | 75 ft. |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Design Reviewed By: | Kevin Turnock |
SSTS Type: | Type I |
SSTS Design: | Mound (Type I) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 2 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |
Self Install? | |
Installer Name: |
None
|
# of New Tanks: | 1 |
# of Existing Tanks: | 0 |
Date of Final Inspection: | 10/22/2021 |
Attach Final Certificate of Installation: |