OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | 48570 173rd place McGrath MN |
Does your property have an E911 address assigned? | Yes |
Septic Type
Select the system you are applying for: | Residential Holding Tank (Type 2) |
Design Information
Attach Septic Design & Management Plan: |
|
Designer Name: |
None
|
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License Number: | 2088 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #51494 (11/19/2020)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 11/19/2020 10:18 AM | $200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 11/19/2020 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Lowell Carlen - 11/19/2020 10:21 AM - witnessed by Pete Gansen 87c08e76a7fa07d05a7af65cb200dcca 4e84599fa23ca6ac7bf6e6d44641ca11 |
#1 Adminstrative Approval Group | Pete Gansen - 11/19/2020 10:22 AM bd00a72303c95647c782a49d8625f5a1 69b74508bdfd6cb7d44832f35016b2a8 |
#3 Final Approval | Pete Gansen - 11/19/2020 10:30 AM 546ab0832ee16854ca03bd25b08492d8 3202f715fa03287314b13067d8772a93 |
#2 Inspector Group | Pete Gansen - 11/19/2020 10:30 AM d91f21760e8b1e77bde0273f2eb5368c ce5f1d445535ab0a8e52dd13272c9641 |
Public Notes
Text: | Permit 45691 approved to replace with new 1500 |
File(s): |
|
Admin Checklist
Date application was complete: | 11/19/2020 |
This review has been started by: | Pete Gansen |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? |
DESIGN REVIEW CHECKLIST
Design Reviewed By: | Pete Gansen |
SSTS Type: | Type I |
SSTS Design: | Holding Tank(s) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 2 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |