OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | denyholland@yahoo.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | take mn-210 go 7.98 miles then go right on hwy 210/mn-210 go 14.18 miles and go left on mn-65 go 4.89 miles turn right on goshawk st. cty 6 go 3.99 miles turn left on 188th ave go .92 miles turn right on186th ave go .23 miles stay straight to go onto 481st street go .19 miles take the second left onto 182nd ave go .21 miles take first left onto 483rd st. house on the right |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | No |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Design Information
Attach Compliance Inspection.: |
|
Project Description
Please describe your proposed project: | I am proposing to build a 20x40 in ground swimming pool with concrete decking at 824 sq.ft. |
What is the height of your structure? | 2 Feet |
Project Type
Item 1 - Structure Type: | Deck/Patio |
Item 1 - Size: | 1624 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 100 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 148 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 20 Feet |
What percent slope of the land currently exists on the project site? | 10 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
black dirt and grass |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #48964 (10/05/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/05/2019 10:49 AM $150 Flat Fee |
$150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $150.00 | ||
Payment 10/05/2019 | $150.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | reno t. powell - 10/05/2019 11:17 AM 4505b9548fc865872242047aa85b6770 14511954ec43b8b3544ba34e5b08cae2 |
#1 Adminstrative Approval Group | Shannon Westerlund - 10/08/2019 8:45 AM 274da61088bb98577a1c657f3890885e 1b457e5d5f50a5e99c5d102e99ad549d |
Public Notes
Text: | Denied, does not meet the 30 foot setback to bluff. sw 10/29/19 Refund of $150 issued. 11/12/19 Kb |
File(s): |
Admin Checklist
Date application was complete: | 10/05/2019 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 75 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | No |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: |
|
Notes: | The proposed ig pool is only 15-20' from the bluff on this application. The vertical distance from the top of bluff to bottom is 26-28' and the horizontal distance is 73'-84'; the slope is about 35%. So it meets the bluff requirement. I can't approve this application because it does not meet the 30' setback requirement from the top of bluff. BH 10/24/2019 |
Was an onsite conducted for this application? | Yes |