OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone Number: |
|
||||
Property Owner Email Address: | w@floeintl.com |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Located at the end of 487th Lane (west of Big Sandy Resort and east of Floe Int'l) |
Project Description
Please describe your proposed project: | After-the-fact Permit App for Land Alteration from driveway creation, grading from removal of old buildings, and vegetation removal. |
Will you be removing vegetation during this project? | Yes |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. |
Attach a copy of your Site Sketch(s): |
|
Vegetation Removal
Number of Trees to be removed: | 5 |
Number of Shrubs to be removed: | 20 |
Type of Clearing Used?
(Check all that apply) |
Mechanical Clearing |
Please explain: | Shrub removal is difficult to count as a clump of hazel brush could consist of several stems...estimate is for the SIZ only. Less than 5 live trees were removed within the SIZ (less than 6" DBH). There was a lot of blow down on the top of the hill as you come into the site that had some trees removal. Most of the vegetation removal consisted of dead trees, which were not counted. A few additional living trees outside of the SIZ were removed that were in the way of the garbage/old building removal as well as for access. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Black Dirt Sand Other (explain below) |
If other, please explain: | Tree stumps, Old buildings/garbage. Estimated 100 yards for the driveway, another 50-100 yards for misc. debris. |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 200 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 10000 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Seeding and/or Mulching |
If other, please explain: | Much of the erosion from this summer has already been seeding and stabilized using seed/mulch. |
Describe how you intend to implement this plan and your finished vegetation plan.: |
See attached map for details. The plan is to leave vegetation as is along the shoreline as well as back 75 ft. Aspen regeneration is already occurring. Area along the wetland will remain seeded (except for fill removal areas). Disturbance area (where buildings used to be) will be seeded and stabilized with appropriate erosion control as needed. The current driveway surface will be re-graded to allow drainage to flow north, away from the main wetland. |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #48924 (09/30/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/04/2019 11:40 AM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 10/07/2019 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Mitch Brinks - 10/04/2019 11:40 AM bac7ae3af430b47f0ff074636bf455dc ef17861dc2b7b627d3eae94f06744960 |
#1 Adminstrative Approval Group | Shannon Westerlund - 10/07/2019 12:41 PM 1ddc0c12063d689eff2ce4305dca5f0c bde713ee2ff7962084cf078d0f65e239 |
#2 Inspector Group | Sam Seybold - 10/07/2019 1:01 PM c19649c3f227ffbae835b07b5f7000de 8efa3efc6170b7ef3106b071170cb95a |
#3 Final Action | Kim Burton - 10/08/2019 10:48 AM e044f4b3187da962b72afc1c3b4ce057 aa3454f2b63fba2de6b7996e20c5c035 |
Public Notes
Text: | Permit # 44730. Work already done, after-the-fact permit. |
File(s): |
|
Internal Notes
Text: | Inspected site multiple times during 2019. Cleared shrub area is growing back. Excavated area has grass now. ss 10/7/2019 |
File(s): |