Vegetation Alteration Permit # 2019-4621, App. # App-2019-005128, UID # 198821
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219, Aitkin, MN 56431
Email: aitkinpz@aitkincountymn.gov
Phone: 218-927-7342
Fax: 218-927-4372
 

Project Location

Property Location:
Property LocationLegal Description
Parcel NumberProperty AddressTownship or City NameOwner Name(s)Taxpayer Name(s)Legal DescriptionPlat NameSection-Township-Range
07-1-089000FARM ISLAND TWPVEERKAMP, CHRISTINA & MICHAELVEERKAMP, CHRISTINA & MICHAELSUNSET ADDITIONS:31 T:46 R:27
07-1-08980028761 PARTRIDGE AVE
AITKIN MN 56431
FARM ISLAND TWPPETERSEN, DEBRA & DARRELL TRUSTEESPETERSEN, DEBRA & DARRELL TRUSTEESSUNSET ADDITIONS:31 T:46 R:27

Required Attachments

Attach a copy of your plan drawing(s):

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Approvals

ApprovalSignatureOptions
ApplicantBruce W. Hawkins - 09/09/2019 7:48 AM
2771b15e27e17cc5c2da92b0c914b399
73dbf2ee499ae3f8cc99f130b7d1642f
 
#1 Adminstrative Approval GroupShannon Westerlund - 09/09/2019 10:34 AM
892dca1693093bbb5b2bb650f03eb385
485ae8ac883f2fadde07b88be78031dd
 
#2 Inspector GroupSam Seybold - 09/09/2019 11:23 AM
188db2493e397d5c114acf06b2171a0d
6cf857c4b0c082980971d4215c3d8399
 
#3 Level Three Final ActionJan Yearneau - 09/09/2019 12:05 PM
13496b342c03f3e1a620181103e4b817
0bd966c68795040642f70412c0fc9654
 
Application has been approved. All signatures have been obtained.
Powered by