OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | No |
Enter directions to the property (if no property address assigned): | 169 south to Diamond Lake Street, go left to 408th Place, go right to end of road. 30307 408th Place |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
6.) Are you applying to install a new septic system? | Yes |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Septic Type
Select the type of septic you are applying for: | Residential Holding Tank (Type 2) |
Design Information
Attach Septic Design & Management Plan: | |
Attach Compliance Inspection.: |
Pumping Agreement
Attach Pumping Agreement: |
Project Description
Please describe your proposed project: | I would like to build a garage 32' deep and 46' wide and approx. 19-2 tall on the backside of my property. Also, add an additional 1500 gallon holding tank. |
What is the height of your structure? | 20 Feet |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 1472 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 150 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 30 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 10 Feet |
What percent slope of the land currently exists on the project site? | 2 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Grass |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #48541 (08/12/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/12/2019 1:58 PM $300 Flat Fee |
$250.00 | x 1 | $250.00 |
added 08/22/2019 9:08 AM $200 Flat Fee |
$150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $400.00 | ||
Payment 08/22/2019 | $400.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Roy J. Rueb - 09/26/2019 4:42 PM 7b57d15fd8e1d1ee144d55f3b7018e58 b464b4bf3e776a5431e0290ce2ae1632 | |
#1 Adminstrative Approval Group | Kim Burton - 09/26/2019 10:30 AM 03c594c0943750053961eba84effb154 30a97f9f49b1e32e9edc75b1702c48cf | |
#2 Inspector Group | Kim Burton - 09/26/2019 10:30 AM 6accf1b00e3adeb33811ca0118f805ae 897831057149f599344629ef439cb421 | |
#3 Level Three Final Action | Jan Yearneau - 09/30/2019 8:59 AM a4651606f7d08158f90b17a0332ca841 0aa15bb535a50be1d888649509b0bb70 |
Text: | Permit# 44701. Approved for a 32' X 46' accessory structure and a Type II holding tank septic. Revised design approved 5/5/20 (see attached). |
File(s): |
|
Text: | Owner submitted a plan to put in a 32 foot x 20 foot buffer/no mow zone on east side of the property and reduce the size of the ramp/beach to 5 feet in width. This meets the spirit of the restrictions Steve Hughes placed on the property in 2006. 9/26/19 ss Good catch on this. Thank you. We will hold the permit and get a hold of Sam and he can contact the landowner to see if they will comply or not before we issue the permit. It appears their shoreline buffer is out of compliance with conditions of the prior land alt permit. Parcels 07-0-047708 & 07-0-047713 are to be combined. I checked w/ Liz Harmon, she said the applicant filed the paperwork and it's good to go. sw 9/17/19 Emailed to KT for septic part. Kb There is an old landscape permit from 2006 (Permit 34189) that allows them to do some shoreline clearing, but also requires them to maintain a 25-foot no mow zone along at least 60-ft of the shoreline. Take a look at the photos I took - it is mowed to the shoreline. Different owner at the time, but it was a condition of approval of the permit. BH 9/17/2019 |
File(s): |
|
Date application was complete: | 08/22/2019 |
Review started by: | Kim Burton |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Zoning Inspector: | Kevin Turnock |
SSTS Type: | Type II |
SSTS Design: | Holding Tank(s) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Does this system belong to an other establishment? | No |
Is this a Cluster System? | No |
Attachments: |
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: |
|
Notes: | See the internal notes from me. |
Was an onsite conducted for this application? | Yes |
Self Install? | |
Installer Name: |
None
|
New Tanks: | 2 |
Existing Tanks: | 0 |
Date of Final Inspection: | 05/15/2020 |
Attach Final Certificate of Installation: |
|
Low Interest Loan or SSTS Grant project? |