OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Email: | amanda.fay@americantowercompany.com | ||||
Property Owner Phone: |
|
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | FROM HWY 210 AND HWY 65 SOUTH, GO SOUTH ON HWY 65 SOUTH 2-3 MILES SOUTH OF MCGREGOR TURN LEFT ONTO CO RD 30 AND GO EAST TO 170TH AVE AND TURN LEFT SITE WILL BE TO THE LEFT OR WEST SIDE OF ROAD. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | Yes |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
6.) Are you applying to install a new septic system? | No |
Project Description
Please describe your proposed project: | Adding 4x10 ft diesel backup generator to existing AT&T cell tower site. |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 40 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
Adding backup diesel 4x10 generator to existing AT&T cell tower site. |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #48457 (08/05/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/09/2019 3:56 PM $50 Flat Fee |
$50.00 | x 1 | $50.00 |
Grand Total | |||
Total | $50.00 | ||
Payment 08/08/2019 | $50.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Zachary Arrasmith - 08/08/2019 10:35 AM 80372446d0cb151df3ceaf6d07ac954f 362bcd2c85be49665ea9953ed51418dd |
#1 Adminstrative Approval Group | Shannon Westerlund - 08/09/2019 4:01 PM d3419344925d715816a596328fb43cee 8a9f66df73411ace55ea99d3d0fa908d |
#2 Inspector Group | Bryan Hargrave - 08/13/2019 9:36 PM 92d99964a20746a3bd7345f252747ede 2b2da7df33d5dbd28eedf7ba7a1ab202 |
#3 Level Three Final Action | Jan Yearneau - 08/14/2019 10:37 AM f6f85f31bc319536dc6eb2f9fdbe6551 b6f74c4c57db7ce6f57c9c9dfa0e6c76 |
Public Notes
Text: | Permit# 44552. Approved for 4'x10' diesel backup generator for existing cell tower (Accessory Building) Commercial addition for $250 was selected. Correct type is Accessory Building for $50. $200 to be refunded. sw 8/9/19 |
File(s): |
|
Admin Checklist
Date application was complete: | 08/08/2019 |
Review started by: | Shannon Wiebusch |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: | |
Notes: | Site inspection done by GIS analysis. No issues with this app. It is close to middle of 35 acre parcel in an upland place. BH |
Was an onsite conducted for this application? | No |