OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | No |
Property Owner Contact
Property Owner Phone: |
|
||||
Property Owner Email: | pru1234@msn.com |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | MN national golf course |
Does your property have an E911 address assigned? | No |
Septic Type
Select the system you are applying for: | Commercial/Cluster 1001-2500 gallons/day |
Design Information
Attach Septic Design & Management Plan: | |
Designer Name: |
None
|
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Licensed Installer Name: |
None
|
Installer License Number: | 2624 |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #47565 (05/01/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/01/2019 3:14 PM | $1,000.00 | x 1 | $1,000.00 |
Grand Total | |||
Total | $1,000.00 | ||
Payment 05/08/2019 | $1,000.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Brian Koski - 05/03/2019 2:07 PM - witnessed by Shannon Wiebusch f8215783d84fc0fbeec887b3d782786a b4302122a44d1d8510e6f424c1c93949 | |
#1 Adminstrative Approval Group | Shannon Westerlund - 05/08/2019 12:47 PM 9805d132243bd67da3181b35059a3cde 991ccfd27a23e4719e1de971cc6f5835 | |
#3 Final Approval | Kim Burton - 05/08/2019 3:37 PM c5050e9783d40b6c90b91b2d4f031513 d7bc4debc931b38682de4d6eda613aa9 | |
#2 Inspector Group | Shannon Westerlund - 05/08/2019 12:47 PM b567daf28135c2e70ddbe359a804abf4 411969ad527da959fb0f5f9c9250bc11 |
Text: | Permit # 44235. Type III 2,490 GPD Commerical Cluster System with operating permit# 617 |
File(s): |
|
Text: | Mail permit w/ operating permit (shannon's desk) |
File(s): |
Date application was complete: | 05/09/2019 |
This review has been started by: | Shannon Wiebusch |
Zoning District of project location: | Farm Residential |
Required OHWL setback distance: | |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | |
Low Interest Loan or SSTS Grant project? | |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? |
Design Reviewed By: | Terry Neff |
SSTS Type: | Type III |
SSTS Design: | "Other"/Performance System (III, IV, V) |
New or Replacement SSTS: | New SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | |
Is this a Cluster System? | Yes |
Does this system belong to an Other Establishment? | Yes |
Does this system require an Operating Permit? | Yes |
Operating Permit #: | 617 |
Additional info (optional): |
Self Install? | |
Installer Name: |
None
|
# of New Tanks: | 4 |
# of Existing Tanks: | 0 |
Date of Final Inspection: | 08/23/2019 |
Attach Final Certificate of Installation: |
|