OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
If we have questions on the application who should we contact? |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Project Location Search
Property: |
|
Driving directions to the property from Aitkin.: | Highway 210 East to Highway 65 North. Go approximately 7 miles and turn right onto Lake Avenue. Go approximately 4.5 miles. Driveway on the left hand side (West). |
Project Description
Please describe your proposed project: | No existing structures. An application was sent to construct a 36" W x 48" L x 20" H pole building and a 8' W x 8' L x 9' H wood shed. There are no wetland or low areas on the properties. Due to the additional 12' set back from the County, we propose to excavate the upper portion of the property to fit the structure onto the land. We propose to excavate 100' L x 48' W x 7' D on back side to 0' front side. Front side faces Lake Avenue. The soil being removed will be relocated under the structure and for the driveway area. Estimated cubic yards to be moved is 480 yards. A silt fence will be used during construction. Once completed we propose to use retaining walls to hold back the soil. |
Site Drawing(s)
Land Alteration Site Sketch Checklist: | Location and size of all existing structures. Location and size of all proposed structures. Location of all driveways and/or access roads. Location of wetlands. Location and size of alteration. Location of erosion control measures. Location of fill disposal, if done on site. Distance of alteration to OHWL (closest point) Distance of alteration to property lines. Distance of alteration to existing structures. Distance of alteration to proposed structures. Cross-section of cut and/or fill locations. |
Attach a copy of your Site Sketch(s): |
Vegetation Removal
Number of Trees to be removed: | 7 |
Number of Shrubs to be removed: | 0 |
Type of Clearing Used?
(Check all that apply) |
Hand Clearing |
Please explain: | Trees removed for structure and dying of ant infestation. Chainsaw to cut and remove trees and limbs. |
Excavation Details
Nature of Material to be used?
(Check all that apply) |
Sand Landscape block/pavers |
Total Amount of Excavation and/or Fill proposed? (cubic yards) | 480 CuYd |
Total Area to be Graded and/or Filled? (L x W) | 4800 ft2 |
Attach a photo of the area to be altered (as it exists today).: |
|
Erosion Control Practices
Indicate the following erosion control measures that will be used throughout and after your project? (Check all that apply) |
Silt Fence Seeding and/or Mulching |
Describe how you intend to implement this plan and your finished vegetation plan.: |
We propose to hire Darlow Excavating for land alteration. We plan to install the retaining walls and sow grass seed once building construction has been completed. |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #46496 (08/31/2018)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/04/2018 12:14 PM $200 Flat Fee |
$200.00 | x 1 | $200.00 |
Grand Total | |||
Total | $200.00 | ||
Payment 09/04/2018 | $200.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Jeffrey T. Anderson - 09/04/2018 12:14 PM da3fd323f60ba234cd223ed7a500a561 8c72d7dc5ce3adbedf1d940863868bae |
Public Notes
Text: | 9.12.18 full online refund given. KK 9-6-18 the land alteration is included with land use permit for their accessory buildings. An erosion control plan will be need in the land use app. sw |
File(s): |
Internal Notes
Text: | 9-6-18 the land alteration is included with land use permit for their accessory buildings. An erosion control plan will be need in the land use app. sw |
File(s): |