OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Are you the Property Owner? | Yes | ||||||||||||||||||||||||||||||||
If we have questions on the application who should we contact? |
|
Property Owner Contact
Property Owner Email: | 78pete282@gmail.com | ||||
Property Owner Phone: |
|
Project Location
Property Location: |
|
Driving directions to the property from Aitkin: | 29471 410th Pl, Aitkin |
Project Description
Please describe your proposed project.: | On my property within the first 30 feet of the lakeshore there was no vegetation growing on the side of a bank. Also a tree standing in that area had fallen into the tree that is still standing in that area. (Branches from the fallen tree are still hanging in the standing tree). I cut up the fallen tree and removed it. The stump is still there. To deal with the bank that was washing down the hill side I fixed the deep ruts placed erosion blanket down and seeded the area. That area has grown in nicely and the bank washing down the hill has stopped. I was unaware that I need to apply for a permit to deal with a fallen tree. I was a aware that I need to apply for a permit to level out the ruts that had washed down the bank. I was a aware that I needed to apply for a permit to place erosion blanket and oversees the area that was washing. |
Vegetation Removal
Number of Trees to be removed: | 1 |
Number of Shrubs to be removed: | 0 |
Type of Clearing
Please select all that apply: | Mechanical Clearing Hand Clearing |
Please explain: | Chainsaw and skid steer used to remove fallen tree. Racks and shovels used to fill ruts |
Required Attachments
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.
To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Justin Wulf - 12/12/2018 3:49 PM - witnessed by Shannon Wiebusch 31ea656f85cff6a3135053a74cd9fc93 634a7db35e2535d230fe3741a649f84d | |
#1 Adminstrative Approval Group | Shannon Westerlund - 12/12/2018 3:49 PM 20e29734215d627e52917afa23e3fb3e 156962aff4db4d0e20668d5815515558 | |
#2 Inspector Group | Shannon Westerlund - 12/12/2018 3:49 PM 1dde5e57a2eed0254cd90e7a4cea40f3 1dbb1a94e0ceaa6178d89b8f4c0f017a | |
#3 Level Three Final Action | Shannon Westerlund - 12/12/2018 3:49 PM db38ec1346af09ed478cc779b106f219 7e150d2072b7783033d9939c91f153a0 |
Text: | P# 44102 approved for vegetation alteration to remove 1 tree and restore shore impact zone per restoration plan. |
File(s): |
|
Text: | 12/12/18 closed out complaint. app was recovered since being canceled in August. Received photos of compliance from owner on 7/31/2018. SW 7/23/18 applicant will be planting trees this week and will email a pic to be uploaded in app. sw |
File(s): |
|
Date application was complete: | 07/31/2018 |
This review has been started by: | Shannon Wiebusch |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Zoning District of project location: | Shoreland |
Is this an After-The-Fact application? | Yes |
Zoning Inspector: | Shannon Wiebusch |
Attach any necessary inspection forms: | |
Was an onsite conducted for this application? | Yes |