OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | From Aitkin, follow Highway 47 about 29 miles south to eastbound Highway 18. Then about 4 ½ miles east to southbound County Road 60 / 270th Avenue. Then 2 ½ miles south to 115th Lane, and turn left. Follow 115th Lane east a half mile to the Red Top sign and another block further to a street sign on the right that says “Richard Street” with an address sign of “26441” hanging. Approximately 200 feet straight south is the area marked for the new building. |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
No |
Project Description
Please describe your proposed project: | I am proposing to construct a 24 x 34 garage with a 24 x 20 second story hobby room. |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 816 ft2 |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Additional Info
Additional info: (optional) |
The design of this building is inspired by the Soo Line Railroad depots such as were in Red Top and McGrath. The foundation will be a reinforced concrete slab. It will eventually have electricity. We did dig a hole in the middle of the site to see how deep the gravel is below grade. A survey of nearby land surveyed by Tom Fulton is attached. Those corner markers were used along with the 1916 Soo Line survey data to find the lines. |
Attachments: (e.g. blueprints, floor plan, compliance inspection, or other information) |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #45247 (03/29/2018)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 03/29/2018 10:02 PM $200 Flat Fee |
$150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $150.00 | ||
Payment 05/03/2018 | $150.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Gerald A. Wollum - 05/03/2018 9:54 PM b847fb97a370a2fcc48e1f942b57eeb6 3612bd1dbe2843ecee4a4ed90143342b |
#1 Adminstrative Approval Group | Kalea Fischer - 05/04/2018 8:38 AM 96882ec30411e16262fcb0a05c27e5cd c198647fc5c88a201690680241f4725b |
Public Notes
Text: | 5/25/18 full online refund issued. KK Needs CI. Transfer letter from 2001 was never addressed by landowner. RS 3-30-18 |
File(s): |
|
Admin Checklist
Date application was complete: | 05/04/2018 |
Review started by: | Kalea Fischer |
Zoning District of project location: | Farm Residential |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | N/A |
Septic Drainfield setback appears to be met with/without an engineer's report? | N/A |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? |