OneGov
App. Status: DeniedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Does your property have an E911 address assigned? | Yes |
Enter directions to the property (if no property address assigned): | From 65 Turn right onto Lake Ave go 7.1 miles.Turn left onto Loon Ave go 6.0 miles.Turn left onto 532nd Lane go 1.6miles .Turn right onto 532 nd Lane go 1.2 miles. Destination on left Timbers Point 21819 532nd ln, Mc Gregor Mn 55760. Indian Shores |
Project Checklist
1.) Is the property zoned Shoreland? | Yes |
3.) Are there any wetlands or lowlands on/near the project site? | Yes |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | No |
Design Information
Attach Compliance Inspection.: |
|
Project Description
Please describe your proposed project: | Sunroom added to front of cabin 10'-26'-26' Log supports Two dormers added to back of existing cabin 8'-16'-8' |
Project Type
Item 1 - Structure Type: | Residence Addition |
Item 1 - Size: | 260 ft2 |
Item 2- Structure Type (if applicable): | Residence Addition |
Item 2 - Size: | 128 ft2 |
Shoreland Data
Setback distance from Ordinary High Water Level to the proposed construction? (closest point) | 75 Feet |
Will the proposed structure(s) be less than 35 foot maximum height? | Yes |
Are you constructing a walkout basement? | No |
If you are building an accessory structure, will there will be a loft or second story? | No |
Natural Landscape Protection Plan
Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? | No |
How many cubic yards of fill or excavation will be done on the property? | 30 CuYd |
How close to the property line will any fill be placed or any excavation be done? | 70 Feet |
What percent slope of the land currently exists on the project site? | 20 % slope |
Select the erosion control methods that will be used throughout and after your project: (Check all that apply) |
|
6.) What will be done after construction to control erosion? |
Replant lawn |
Site Plan
Attach Site Plan: |
|
Is the site staked and ready for inspection? | Yes |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #44780 (10/24/2017)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 12/11/2017 11:18 AM $300 Flat Fee |
$250.00 | x 1 | $250.00 |
added 12/11/2017 11:18 AM $300 Flat Fee |
$250.00 | x 1 | $250.00 |
Grand Total | |||
Total | $500.00 | ||
Due | $500.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant |
Text: | 1.31.18 full online refund given. KK FEBRUARY 9, 2018 IS 60-DAY DEADLINE. Appears to require CUP for flood proofing. Pete called applicant and left message. Will most likely have to deny in the next couple days and refund and Pete will talk to the applicant about the CUP process. PPG1-23-17 1-23-18 Applicant emailed about status of permit. Emailed Pete. 1-16-18 Emailed Pete 1-10-18 Received elevation certificate from applicant. Emailed Kevin for review of elevation cert. Pete was going to call applicant. KS 1-4-18 Rec'd email from applicant with plat and survey. Per applicant, the deck will be removed and the structure will meet the 75 ft lake setback. Still waiting on elevation certificate. KS 12-28-17 2 week deadline. Moved application to incomplete and emailed applicant. KS 12-15-17 Emailed applicant, need an elevation cert and better site plan. |
File(s): |
|
Text: | Based on review of the elevation cert applicant will need to get a conditional use for floodproofed addition. Also will need to address if the existing house is floodproofed. Pete and Terry reviewed the elev cert. Pete to call applicant. |
File(s): |
Date application was complete: | |
Review started by: | |
Zoning District of project location: | Shoreland |
Required OWHL setback distance: | 75 ft. |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | Yes |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | Yes |
Zoning Inspector: | |
SSTS Type: | |
SSTS Design: | |
New or Replacement SSTS: | |
GPD: | |
# of bedrooms: | |
Does this system require an Operating Permit? | |
Operating Permit #: | |
Does this system belong to an other establishment? | |
Is this a Cluster System? | |
Attachments: |
Zoning Inspector: | Please select |
Attach necessary inspection forms/photos: | |
Notes: | |
Was an onsite conducted for this application? | No |
Self Install? | |
Installer Name: |
None
|
New Tanks: | |
Existing Tanks: | |
Date of Final Inspection: | |
Attach Final Certificate of Installation: | |
Low Interest Loan or SSTS Grant project? |