OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Enter Applicant Contact Information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no property address assigned): | north of Mcgrath mn to birch street or cty 26 go east on birch street for 6-miles on left address 15884 birch street |
Project Checklist
1.) Is the property zoned Shoreland? | No |
3.) Are there any wetlands or lowlands on/near the project site? | No |
4.) Will the structure(s) be used for commercial purposes? | No |
5.) Is there an existing septic system on the property? (Outhouse/Privies are also considered septic systems) |
Yes |
Existing Septic Status
Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? | Yes |
Project Description
Please describe your proposed project: | pole building 32 by 48 |
Project Type
Item 1 - Structure Type: | Accessory Building |
Item 1 - Size: | 1536 ft2 |
Site Plan
Attach Site Plan: |
|
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Invoice #942 (06/22/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/22/2016 9:55 AM $175 Flat Fee |
$175.00 | x 1 | $175.00 |
Grand Total | |||
Total | $175.00 | ||
Payment 06/22/2016 | $175.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Donald radermacher - 06/23/2016 10:39 AM - witnessed by Kalea Fischer 00b4177f9da24a19a817dbed0a5e734f 6cbc4a5f26fceb29f32808e70818b849 |
#1 Adminstrative Approval Group | Kalea Suihkonen - 06/23/2016 10:42 AM 39e1077eb35f1edeb5cbeb38f7ad4b13 d63c91f3869a13d3b5aba0d9c1267f25 |
#2 Inspector Group | Bryan Hargrave - 07/04/2016 3:10 PM 6d48a6131d465d1fa61af897be7769fd f8c49bf8c00063e2a3683916fc92e5f0 |
#3 Level Three Final Action | Kalea Suihkonen - 07/05/2016 9:35 AM e536e4ee0746e1809f86d653042b8f69 e2ebd5778115594f653e88882f6630d0 |
Public Notes
Text: | permit 42109 issued for a 32x48 ft pole building (no running water, not for human habitation, not for commercial use) |
File(s): |
|
Admin Checklist
Date application was complete: | |
Review started by: | |
Zoning District of project location: | Public |
Required OWHL setback distance: | |
"Other" OHWL setback distance is: | |
Project located in the floodplain? | No |
Base Flood Elevation: | |
Lowest Floor Elevation: | |
Is an after construction elevation certificate required? | |
Property line setbacks appear to be met? | Yes |
Road R-O-W setbacks appear to be met? | Yes |
Bluff setbacks appear to be met? | N/A |
Septic Tank setback appears to be met with/without an engineer's report? | Yes |
Septic Drainfield setback appears to be met with/without an engineer's report? | Yes |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? | Yes |
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot? | |
Is this After-The-Fact? | No |
Inspector Checklist
Zoning Inspector: | Bryan Hargrave |
Attach necessary inspection forms/photos: |
|
Notes: | |
Was an onsite conducted for this application? |