OneGov
App. Status: ApprovedAitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
Contact Information
Applicant contact information: |
|
||||||||||||||||||||||||||||||||
Are you the Property Owner? | Yes |
Property Location
Property Location: |
|
Enter directions to the property (if no address assigned): | 169 to grove st, left 5 miles to co rd 3 (turn toward emily) 1 mile to 405th pl |
Does your property have an E911 address assigned? | Yes |
Septic Type
Select the system you are applying for: | Residential Holding Tank (Type 2) |
Design Information
Attach Septic Design & Management Plan: |
|
Designer Name: |
None
|
Pumping Agreement
Attach Signed Pumping Agreement: |
Installer
Self Install or Licensed Install?: | Licensed Septic Installer |
Terms
Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.
The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.
It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.
Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).
All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.
The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.
After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.
Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.
Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.
Invoice #800 (06/07/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/07/2016 8:03 AM | $150.00 | x 1 | $150.00 |
Grand Total | |||
Total | $150.00 | ||
Payment 06/07/2016 | $150.00 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Adam Ladd - 06/07/2016 8:07 AM - witnessed by Kalea Fischer 4f4ebe84e80b87e9e120053be7cdd7ff caff131c6d9f1a432a5634667682d60c | |
#1 Adminstrative Approval Group | Kalea Suihkonen - 06/07/2016 8:08 AM 86ae46660126f33d7d987cb29eaba5cc 18c3ae599f31375fbdede58cf74e5259 | |
#3 Final Approval | Kalea Suihkonen - 06/07/2016 8:08 AM 3fb9885bf1040771bfee9a0dbb8ca123 9a119dec53169733d0e9a83bf937999f | |
#2 Inspector Group | Kalea Suihkonen - 06/07/2016 8:08 AM 05a9ade919d3af309c6be16a7bb71ec2 e835bbb15aa21886d0ddc6c4e6ccf205 |
Text: | permit 42012 issued for a holding tank |
File(s): |
|
Text: | |
File(s): |
Date application was complete: | |
This review has been started by: | |
Zoning District of project location: | Shoreland |
Required OHWL setback distance: | 75 ft. |
"Other" OHWL setback distance is: | |
Pumping Agreement Attached? | Yes |
Low Interest Loan or SSTS Grant project? | No |
Is this an After-The-Fact application? | No |
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? |
Design Reviewed By: | Kevin Turnock |
SSTS Type: | Type II |
SSTS Design: | Holding Tank(s) |
New or Replacement SSTS: | Replacement SSTS |
GPD: | 1-2,499 gpd |
# of bedrooms: | 0 |
Is this a Cluster System? | No |
Does this system belong to an Other Establishment? | No |
Does this system require an Operating Permit? | No |
Operating Permit #: | |
Additional info (optional): |
Self Install? | |
Installer Name: |
None
|
# of New Tanks: | 1 |
# of Existing Tanks: | 1 |
Date of Final Inspection: | 11/10/2016 |
Attach Final Certificate of Installation: |
|