Land Use Application Permit # 2016-0356, App. # App-2016-000361, UID # 981
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
glen t buchman
Phone:
(612270 - 2820
Email Address:
gtmmbuchman@gmail.com
Mailing Address:
11120 yukon st. nw
Coon Rapisa mn 55433
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
39-0-04030023310 480TH ST
MCGREGOR MN 55760
WORKMAN TWPS:23 T:49 R:24RDRAT LAKENEWGARD, TERRY & JEANNEWGARD, TERRY & JEAN
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
23310 480 th st McGregor, Mn

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
40x60 pole building

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 2400 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 300 Feet
Will the proposed structure(s) be less than 35 foot maximum height? No
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 100 CuYd
How close to the property line will any fill be placed or any excavation be done? 50 Feet
What percent slope of the land currently exists on the project site? 2 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
nothing

Site Plan

Attach Site Plan:

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #679 (05/26/2016)

Charge Cost Quantity Total
Non-Taxable
added 05/26/2016 3:58 PM

$175 Flat Fee

$175.00 x 1 $175.00
Grand Total
Total $175.00
Payment 05/26/2016$175.00
Due$0.00

Approvals

ApprovalSignature
ApplicantGlen Buchman - 05/26/2016 4:00 PM - witnessed by Pete Gansen
70b151c104a72d0c4ba107474efc0860
f60ed78c41d7d4b63afe59f180320934
#1 Adminstrative Approval GroupPete Gansen - 05/26/2016 4:02 PM
5865e521258e46c1b082962fca447803
778ec38a4ff55abddc8b0972f729d00f
#2 Inspector GroupBryan Hargrave - 06/10/2016 8:35 AM
e1642491be2725992cece8e98d16bea8
c385d96e47cdb86aedc8b38a796b4484
#3 Level Three Final ActionKalea Suihkonen - 06/14/2016 12:29 PM
d403bc4594d2939ac460df4539278573
d2738b1bedf9c97b1d984e00afab2b8f
Application has been approved. All signatures have been obtained.

Public Notes

Text:
9-5-17 renewed permit (See attached)
permit 42046 issued for a 40x60 ft pole building (no running water, not for human habitation, not for commercial use)
File(s):

Admin Checklist

Date application was complete:
Review started by: Pete Gansen
Zoning District of project location: Shoreland
Required OWHL setback distance: 100 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required? No
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? Yes
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Please select
Attach necessary inspection forms/photos:
Notes:
Was an onsite conducted for this application?
Powered by