Land Use Application Permit # 2016-0291, App. # App-2016-000275, UID # 854
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Chris Nelson
Phone:
(218330 - 9530
Email Address:
nelsonnlbmn@gmail.com
Mailing Address:
31519 395th Place
Aitkin Mn 56431
Are you the Property Owner? No

Property Owner Contact

Property Owner Email: nelsonnlbmn@gmail.com
Property Owner Phone:
(218330 - 9530

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
07-0-046002FARM ISLAND TWPS:23 T:46 R:27SPIRIT - BACK LOTFOLSOM, ROBERT A & RACHAEL CFOLSOM, ROBERT A & RACHAEL C
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
south 169 -east on diamond lake st-south 411pl-south414pl

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
30 x 36 garage

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 1080 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 180 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? Yes

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
How many cubic yards of fill or excavation will be done on the property? 10 CuYd
How close to the property line will any fill be placed or any excavation be done? 50 Feet
What percent slope of the land currently exists on the project site? 20 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
seed grass

Site Plan

Attach Site Plan:

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #561 (05/19/2016)

Charge Cost Quantity Total
Non-Taxable
added 05/19/2016 8:28 AM

$175 Flat Fee

$175.00 x 1 $175.00
Grand Total
Total $175.00
Payment 05/19/2016$175.00
Due$0.00

Approvals

ApprovalSignature
ApplicantChris Nelson - 05/19/2016 8:28 AM
f7fc7af27e7e44963b90280616237d36
c0c4b8caedcb1e3deefb9ab7fd218d30
#1 Adminstrative Approval GroupKalea Suihkonen - 05/19/2016 12:21 PM
4318fbee21b9b24a986dc80d2d3ad1bf
e2e8bb0bb6002a72cd803001c670cd70
#2 Inspector GroupBryan Hargrave - 06/02/2016 7:46 AM
2bd9f46ff88e0871581ce6ccf0c2cdd8
3fa1bdd75d3cf20a4bc2b5312675f11e
#3 Level Three Final ActionKristi Kunz - 06/02/2016 9:13 AM
07121e320b8db721cf6373d9a2c71298
3394ab52a35ea9884ff714edd168f33f
Application has been approved. All signatures have been obtained.

Public Notes

Text:
P#41990 approved on 6.2.16 to construct a 30 foot x 36 foot accessory building - not to be used for commercial use, not for human habitation, no running water to the structure.
File(s):

Admin Checklist

Date application was complete:
Review started by:
Zoning District of project location: Shoreland
Required OWHL setback distance: 100 ft.
"Other" OHWL setback distance is:
Project located in the floodplain? No
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Bryan Hargrave
Attach necessary inspection forms/photos:
Notes:
Was an onsite conducted for this application?
Powered by