Land Use Application Permit # 2016-0290, App. # App-2016-000265, UID # 833
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Terrance R. Roy, Jr.
Phone:
(651274 - 0339
Email Address:
aitkinpz@co.aitkin.mn.us
Mailing Address:
47011 185th Ave.
Mcgregor MN 55760
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
29-1-31160047011 185th Ave
MCGREGOR, MN 55760
SHAMROCK TWPSHESHEBE POINT THIRD ADDITIONS:27 T:49 R:23SGDMINNEWAWA - BACK LOTROY, TERRANCE R JRROY, TERRANCE R JR
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
North Hwy 65 to Co RD 6 to 185th First house on corner.

Project Checklist

1.) Is the property zoned Shoreland? No
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Project Description

Please describe your proposed project:
30 x  40 x 8 2 car garage.

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 1200 ft2

Site Plan

Attach Site Plan:

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #540 (05/17/2016)

Charge Cost Quantity Total
Non-Taxable
added 05/17/2016 10:43 AM

$175 Flat Fee

$175.00 x 1 $175.00
Grand Total
Total $175.00
Payment 05/17/2016$175.00
Due$0.00

Approvals

ApprovalSignature
ApplicantTerrance Roy - 05/17/2016 10:47 AM - witnessed by Kristi Kunz
ecd00d1ee6a0f04a0aeabc5144b69aa2
d33d0c66241409399e1692809bbac388
#1 Adminstrative Approval GroupKristi Kunz - 05/17/2016 10:47 AM
77fc1ef7bc1564424c89dd5aaf6dec3b
77c00467b2584ea33618eb8e9b9e6b5e
#2 Inspector GroupBryan Hargrave - 06/01/2016 8:07 AM
6c00b3f62cb26fd297e5e285c8c43d3f
b304073a42e9ef2ca248365e0f6bf7c9
#3 Level Three Final ActionKristi Kunz - 06/02/2016 8:57 AM
a8519e4aa0bbb70532df93386f517de0
22874ba2503196e3cab50df5582ce375
Application has been approved. All signatures have been obtained.

Public Notes

Text:
P#41988 approved on 6.2.16 to construct a 30 foot x 40 foot accessory building - not for human habitation, not for commercial use, no running water to the structure.
File(s):

Admin Checklist

Date application was complete:
Review started by: Kristi Kunz
Zoning District of project location: Open
Required OWHL setback distance:
"Other" OHWL setback distance is:
Project located in the floodplain?
Base Flood Elevation:
Lowest Floor Elevation:
Is an after construction elevation certificate required?
Property line setbacks appear to be met? Yes
Road R-O-W setbacks appear to be met? Yes
Bluff setbacks appear to be met? N/A
Septic Tank setback appears to be met with/without an engineer's report? Yes
Septic Drainfield setback appears to be met with/without an engineer's report? Yes
Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
Is this After-The-Fact? No

Inspector Checklist

Zoning Inspector: Bryan Hargrave
Attach necessary inspection forms/photos:
Notes:
Was an onsite conducted for this application?
Powered by