Land Use Application Permit # 2016-0118, App. # App-2016-000204, UID # 728
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

Enter Applicant Contact Information:
Name:
Cecil Hartell
Phone:
(651399 - 0205
Email Address:
hartnell20304@hotmail.com
Mailing Address:
35101 630th Lane
Hill City MN 55748
Are you the Property Owner? Yes

Property Location

Property Location:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
20-0-01610035101 630th Ln
HILL CITY, MN 55748
MACVILLE TWPS:11 T:51 R:26HARTNELL, BARBARA & CECILHARTNELL, BARBARA & CECIL
Does your property have an E911 address assigned? Yes
Enter directions to the property (if no property address assigned):
Hwy 169 North to 630th. Turn Right.First driveway on right, turn right

Project Checklist

1.) Is the property zoned Shoreland? Yes
3.) Are there any wetlands or lowlands on/near the project site? No
4.) Will the structure(s) be used for commercial purposes? No
5.) Is there an existing septic system on the property?
(Outhouse/Privies are also considered septic systems)
Yes

Existing Septic Status

Do you have a Certificate of Compliance, Certificate of Installation, Design for a new system, or does your project fall under Exemption A or B above? Yes

Design Information

Attach Compliance Inspection.:

Project Description

Please describe your proposed project:
36x24 3 stall garage

Project Type

Item 1 - Structure Type: Accessory Building
Item 1 - Size: 864 ft2

Shoreland Data

Setback distance from Ordinary High Water Level to the proposed construction? (closest point) 200 Feet
Will the proposed structure(s) be less than 35 foot maximum height? Yes
Are you constructing a walkout basement? No
If you are building an accessory structure, will there will be a loft or second story? No

Natural Landscape Protection Plan

Will there be any vegetation removal, earth moving, or fill placed in the Shore Impact Zone, Bluff Impact Zone or on a Steep Slope? No
(If yes, please attach plan):
How many cubic yards of fill or excavation will be done on the property? 96 CuYd
How close to the property line will any fill be placed or any excavation be done? 50 Feet
What percent slope of the land currently exists on the project site? 0 % slope
Select the erosion control methods that will be used throughout and after your project:
(Check all that apply)
6.) What will be done after construction to control
erosion?
Plant grass excluding the drive way

Site Plan

Attach Site Plan:

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

Land Use/Septic Terms & Conditions
  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The septic installer shall notify Aitkin County Environmental Services a minimum of twenty-four (24) hours before the covering of any portion of the septic installation. Changes from the approved septic design will require approval by the County prior to construction.

  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • All corners of the proposed structure(s) need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • Applicants acknowledge that they are in compliance with MN Statute 326.121 subd 1 which states "The State Building Code is the standard that applies statewide for the construction, reconstruction, alteration, repair, use of buildings and other structures of the type governed by the code."

  • Applicants acknowledge that they are in compliance with MN Contractor Licensing laws per MN Statute 326B.85.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #436 (05/06/2016)

Charge Cost Quantity Total
Non-Taxable
added 05/06/2016 2:24 PM

$175 Flat Fee

$175.00 x 1 $175.00
Grand Total
Total $175.00
Payment 05/06/2016$175.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantBarbara Cecil - 05/06/2016 2:26 PM - witnessed by Pete Gansen
f894fabd5e5e258c78dc465d49e86e7f
cdc0a374dca6eb0c1e80dfaa9ada4935
 
#1 Adminstrative Approval GroupPete Gansen - 05/06/2016 2:29 PM
388864e2cba5559d74cad2249b58f41a
31e3fce2a2370420966936e0e5299b3e
 
#2 Inspector GroupPete Gansen - 05/06/2016 2:29 PM
eb3e352ee1c95d409b0143ad20a47faf
97af35c4aec1a442618d22a7955eee5b
 
#3 Level Three Final ActionPete Gansen - 05/06/2016 2:30 PM
2efdcad5ee59623149ac12478c55c8d1
39371b78d62e241a6458bbd073cc0179
 
Application has been approved. All signatures have been obtained.
Text:
P#41892 approved for a 24 foot x 36 foot accessory building not to be used for commercial use, not for human habitation, and no running water to the structure.
File(s):
Text:
ci on file 4.5.16
File(s):
    Date application was complete:
    Review started by: Kevin Turnock
    Zoning District of project location: Shoreland
    Required OWHL setback distance: Other
    "Other" OHWL setback distance is: 200
    Project located in the floodplain? Yes
    Base Flood Elevation: 1266.3
    Lowest Floor Elevation: 1267.3
    Is an after construction elevation certificate required? No
    Property line setbacks appear to be met? Yes
    Road R-O-W setbacks appear to be met? Yes
    Bluff setbacks appear to be met? Yes
    Septic Tank setback appears to be met with/without an engineer's report? Yes
    Septic Drainfield setback appears to be met with/without an engineer's report? Yes
    Is the parcel a Lot of Record before 1-21-92 or have alternate sites been identified? Yes
    Is this New Construction on a previously undeveloped lot or Redevelopment added to a developed lot?
    Is this After-The-Fact? No
    Zoning Inspector:
    SSTS Type:
    SSTS Design:
    New or Replacement SSTS:
    GPD:
    # of bedrooms:
    Does this system require an Operating Permit?
    Operating Permit #:
    Does this system belong to an other establishment?
    Is this a Cluster System?
    Attachments:
      Zoning Inspector:
      Attach necessary inspection forms/photos:
        Notes:
        Was an onsite conducted for this application?
        Self Install?
        Installer Name:
        None
        New Tanks:
        Existing Tanks:
        Date of Final Inspection:
        Attach Final Certificate of Installation:
          Low Interest Loan or SSTS Grant project?
          Powered by