Land Alteration Permit # 2016-0161, App. # App-2016-000145, UID # 650
App. Status: Approved
Aitkin County Planning & Zoning / Environmental Services
307 Second St. NW Room 219
Aitkin, MN 56431
Phone: 218-927-7342
Fax: 218-927-4372
Email: aitkinpz@aitkincountymn.gov
 

Contact Information

If we have questions on the application who should we contact?
Name:
brad p sieberg
Phone:
(507380 - 6217
Email Address:
bsieberg@hickorytech.net
Mailing Address:
31 eagleridge trail
north mankato mn 56003
Are you the Property Owner? Yes

Property Owner Contact

Property Owner Phone Number:
(507380 - 6217
Property Owner Email Address: bsieberg@hickorytech.net

Project Location Search

Property:
Property LocationLegal DescriptionProperty AttributesOwner InformationTax Payer Information
Parcel NumberProperty AddressTownship or City NameLegal DescriptionPlat NameSection-Township-RangeLake ClassLake NameOwner Name(s)Taxpayer Name(s)
11-1-09130043094 Conifer St
AITKIN, MN 56431
HAZELTON TWPCOOLGALE PARKS:33 T:45 R:27GDMILLE LACSSIEBERG, BRADLEY & ELIZABETHSIEBERG, BRADLEY & ELIZABETH
Driving directions to the property from Aitkin.:
south on hwy 169 to state hwy 18 go east on 18 for aprox 1/4 mile than turn right onto conifer street  go another 1/4 mile   43094  street address

Project Description

Please describe your proposed project:
Lakeshore access cut out is partly on neighbors property.  Would like to move it over 5' to be on our property.  Add retaining block to each side of cut out to prevent erosion.  aprox soil to be moved 7-10 yards

Site Drawing(s)

Land Alteration Site Sketch Checklist:
Location and size of all existing structures.
Location and size of all proposed structures.
Location of all driveways and/or access roads.
Location of wetlands.
Location and size of alteration.
Location of erosion control measures.
Location of fill disposal, if done on site.
Distance of alteration to OHWL (closest point)
Distance of alteration to property lines.
Distance of alteration to existing structures.
Distance of alteration to proposed structures.
Cross-section of cut and/or fill locations.
Attach a copy of your Site Sketch(s):

Vegetation Removal

Number of Trees to be removed: 0
Number of Shrubs to be removed: 0
Type of Clearing Used?
(Check all that apply)
Mechanical Clearing
Hand Clearing
Please explain:
mini excavator will be used to did channel for small retaining wall  once wall is in place will move the sand from inside of the wall to the backside of opposite wall to fill in the cut out which is currently on the neighbors property.     so basiclly going to take from one side and put to the other side untill the cut out is fully on our property

Excavation Details

Nature of Material to be used?
(Check all that apply)
Sand
Gravel
Rock
Landscape block/pavers
Total Amount of Excavation and/or Fill proposed? (cubic yards) 9 CuYd
Total Area to be Graded and/or Filled? (L x W) 90 ft2
Attach a photo of the area to be altered (as it exists today).:

Erosion Control Practices

Indicate the following erosion control measures that
will be used throughout and after your project?
(Check all that apply)
Seeding and/or Mulching
Other (explain below)
If other, please explain:
tarp
Describe how you intend to implement this plan
and your finished vegetation plan.:
plant grass on both sides of retaining wall

Terms

General Terms Zoning Permits
  • Defining and staking the property lines, road right-of-ways, septic sites, and wells are the responsibility of the property owner. In some cases, a registered survey may be required to verify setbacks before granting a permit.

  • If you see sections marked in red on the left hand column, you must re-visit those sections and make corrections.

  • To ensure that earth moving and vegetation removal is within ordinance guidelines, and to ensure activity on your property does not negatively impact the lake or other properties, you may be required to provide additional drawings of your site plan.

Land Use/Septic General Terms
  • Zoning permits and Subsurface Sewage Treatment System permits are valid for one (1) year (unless the sewage permit is to upgrade an Imminent Threat to Public Health or Safety system, which is then valid for ten (10) months).

  • If property lines are not clearly marked and visible, then they need to be staked with visible flags, ribbon, or lathes prior to onsite inspection by Aitkin County.

  • It shall be a violation of the Aitkin County Zoning Ordinance to commence construction before the permit application is approved by Aitkin County.

  • The landowner or authorized agent may make application for a zoning permit agreeing to do such work in accordance with all Aitkin County Ordinances. The landowner or authorized agent agrees that the application, site plan, and all other attachments submitted herewith are true and accurate and shall become a part of the permit. The landowner or authorized agent agrees that, in making application for a zoning permit, the landowner grants permission to Aitkin County, at reasonable times, to enter the property to determine compliance of the application with applicable Local, County or State Ordinances or Statutes. It is the applicants sole responsibility to contact other Local, County or State agencies to ensure the applicant has complied with all relevant Local, County or State Ordinances or Statutes.

  • After a complete application is submitted and reviewed, an on-site inspection may be conducted; a permit may be issued describing the proposed construction that may take place on the property. Changes to a project may require a permit application to be resubmitted.

  • Applicants are responsible for getting all applicable entrance permits from the appropriate road authority.

Invoice #358 (05/02/2016)

Charge Cost Quantity Total
Non-Taxable
added 05/02/2016 8:16 PM

$150 Flat Fee

$150.00 x 1 $150.00
Grand Total
Total $150.00
Payment 05/02/2016$150.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
Applicantbrad p. sieberg - 05/02/2016 8:16 PM
f2d79b8e01c506c826f0e047a733ec46
a57f39daa436ca475ccf8035c6872f00
 
#1 Adminstrative Approval GroupKristi Kunz - 05/03/2016 11:50 AM
ec65ef8023fdf3d9954eb50dec8ae96e
14a60e4f3be29d047036eef41fbfc29c
 
#2 Inspector GroupBryan Hargrave - 05/16/2016 7:03 AM
6cc705abd15049bad4ba01f82a835d80
6945fda293b265d2a1754795aa3733d9
 
#3 Final ActionKristi Kunz - 05/16/2016 11:19 AM
25e548a2cdfa5d7b848f7de233aa62b4
a6dfb0b0134141997678183c71c3e99a
 
Application has been approved. All signatures have been obtained.
Text:
P# 41927 approved for a land alteration per application # 2016-000145 with one condition: Large basswood and Large Sugar Maple not to be disturbed.

Inspector Notes: There is a large basswood tree on the top of the bank. I noted on the field eval sheet that this tree should not be removed due to possible bank destabilization. There is also a large sugar maple back from the bank that should not be disturbed also. BCH 5.12.2016
File(s):
Text:
ci dated 2012 - per Terry Neff a new inspection is not needed for this land alteration application. KLK 5.3.16

There is a large basswood tree on the top of the bank. I noted on the field eval sheet that this tree should not be removed due to possible bank destabilization. There is also a large sugar maple back from the bank that should not be disturbed also. BCH 5.12.2016
File(s):
    Date application was complete:
    This review has been started by: Kristi Kunz
    Zoning District of project location: Shoreland
    Zoning Inspector: Bryan Hargrave
    Attach necessary inspection forms:
    Is the project in the Shore Impact Zone?
    Was an onsite conducted for this application?
    Is this an After-The-Fact application? No
    Project located in the floodplain? No
    Base Flood Elevation:
    Powered by